tw * * * * <w< 




> 






NOTICE OF INCORPORATION 

United States Legal Document 

$3T All citizens and residents are hereby advised that 

this is a legally binding document duly incorporated by 

reference and that failure to comply with such 

requirements as hereby detailed within may subject you 

to criminal or civil penalties under the law. Ignorance of 

the law shall not excuse noncompliance and it is the 

responsibility of the citizens to inform themselves as to 

the laws that are enacted in the United States of America 

and in the states and cities contained therein. ~^k 

* * 
* 

ASCE 21-05 (2005), Automated People Mover 
Standards, Part 1, as incorporated into the 
Indiana Safety Codes for Elevators, Escalators, 
Manlifts and Hoists, Indiana Administrative 
Code, Rule 11, 675 IAC 21-11-1. 



r csw»»ae.'v 



^tffty*. 



a 






s£ 






m^mmk:* * * * mm^mmmxm 



ASCE STANDARD 



ANSI/ASCE/T&DI 21-05 



American Society of Civil Engineers 

Automated People Mover 
Standards — Part 1 



This document uses both the International System of Units (SI) 
and customary units. 

Operating Environment 
Safety Requirements 
System Dependability 
Automatic Train Control (ATC) 
Audio and Visual Communications 



t <s^ "'nil *V 



ANSI 



Published by the American Society of Civil Engineers 




T&Dl 



Library of Congress Cataloging-in~Publication Data 

Automated people mover / American Society of Civil Engineers, 
p. cm. 
ISBN 0-7844-0873-4 
1 . Personal rapid transit. I. American Society of Civil Engineers. 

TA1207.A95 2006 

625.4—dc22 2006017165 

Published by American Society of Civil Engineers 
1801 Alexander Bell Drive 
Reston, Virginia 20191 
www.pubs.asce.org 

Any statements expressed in these materials are those of the indi- 
vidual authors and do not necessarily represent the views of ASCE, 
which takes no responsibility for any statement made herein. No 
reference made in this publication to any specific method, product, 
process, or service constitutes or implies an endorsement, recom- 
mendation, or warranty thereof by ASCE. The materials are for 
general information only and do not represent a standard of ASCE, 
nor are they intended as a reference in purchase specifications, con- 
tracts, regulations, statutes, or any other legal document. 

ASCE makes no representation or warranty of any kind, whether 
express or implied, concerning the accuracy, completeness, suit- 
ability, or utility of any information, apparatus, product, or process 
discussed in this publication, and assumes no liability therefore. 
This information should not be used without first securing compe- 
tent advice with respect to its suitability for any general or specific 
application. Anyone utilizing this information assumes all liability 
arising from such use, including but not limited to infringement of 
any patent or patents. 

ASCE and American Society of Civil Engineers — Registered in U.S. 
Patent and Trademark Office. 

Photocopies and reprints. You can obtain instant permission to 
photocopy ASCE publications by using ASCE's online permission 
service www. pubs. asce.org/authors/RightslinkWelcome Page.html. 
Requests for 100 copies or more should be submitted to the Reprints 
Department, Publications Division, ASCE (address above); email: 
permissions@asce.org. A reprint order form can be found at www. 
pubs.asce.org/authors/reprints.html 

Copyright © 2006 by the American Society of Civil Engineers. 

All Rights Reserved. 

ISBN 0-7844-0873-4 

Manufactured in the United States of America. 



STANDARDS 



In 2003, the Board of Direction approved the revi- 
sion to the ASCE Rules for Standards Committees 
to govern the writing and maintenance of standards 
developed by the Society. All such standards are 
developed by a consensus standards process managed 
by the Society's Codes and Standards Committee 
(CSC). The consensus process includes balloting by 
a balanced standards committee made up of Society 
members and nonmembers, balloting by the mem- 
bership of the Society as a whole, and balloting by 
the public. All standards are updated or reaffirmed 
by the same process at intervals not exceeding five 
years. 

The following Standards have been issued: 

ANSI/ASCE 1-82 N-725 Guideline for Design 

and Analysis of Nuclear Safety Related Earth 

Structures 
ANSI/ASCE 2-91 Measurement of Oxygen Transfer in 

Clean Water 
ANSI/ASCE 3-91 Standard for the Structural Design 

of Composite Slabs and ANSI/ASCE 9-91 Standard 

Practice for the Construction and Inspection of 

Composite Slabs 
ASCE 4-98 Seismic Analysis of Safety -Related 

Nuclear Structures 
Building Code Requirements for Masonry Structures 

(Acf 530-02/ASCE 5-02/TMS 402-02) and 

Specifications for Masonry Structures (ACI 530.1- 

02/ASCE 6-02/TMS 602-02) 
ASCE/SEI 7-05 Minimum Design Loads for Buildings 

and Other Structures 
SEI/ASCE 8-02 Standard Specification for the Design 

of Cold-Formed Stainless Steel Structural Members 
ANSI/ASCE 9-91 listed with ASCE 3-91 
ASCE 10-97 Design of Latticed Steel Transmission 

Structures 
SEI/ASCE 1.1-99 Guideline for Structural Condition 

Assessment of Existing Buildings 
ASCE/EWRI 12-05 Guideline for the Design of Urban 

Subsurface Drainage 
ASCE/EWRI 13-05 Standard Guidelines for 

Installation of Urban Subsurface Drainage 
ASCE/EWRI 14-05 Standard Guidelines for 

Operation and Maintenance of Urban Subsurface 

Drainage 
ASCE 15-98 Standard Practice for Direct Design 

of Buried Precast Concrete Pipe Using Standard 

Installations (SIDD) 
ASCE 16-95 Standard for Load Resistance Factor 

Design (LRFD) of Engineered Wood Construction 



ASCE 17-96 Air-Supported Structures 

ASCE 18-96 Standard Guidelines for In-Process 

Oxygen Transfer Testing 
ASCE 19-96 Structural Applications of Steel Cables 

for Buildings 
ASCE 20-96 Standard Guidelines for the Design and 

Installation of Pile Foundations 
ANSI/ASCE/T&DI 21-05 Automated People Mover 

Standards— Part 1 
ASCE 21-98 Automated People Mover Standards- 
Part 2 
ANSI/ASCE 21-00 Automated People Mover 

Standards — Part 3 
SEI/ASCE 23-97 Specification for Structural Steel 

Beams with Web Openings 
ASCE/SEI 24-05 Flood Resistant Design and 

Construction 
ASCE/SEI 25-06 Earthquake-Actuated Automatic Gas 

Shutoff Devices 
ASCE 26-97 Standard Practice for Design of Buried 

Precast Concrete Box Sections 
ASCE 27-00 Standard Practice for Direct Design of 

Precast Concrete Pipe for Jacking in Trenchless 

Construction 
ASCE 28-00 Standard Practice for Direct Design 

of Precast Concrete Box Sections for Jacking in 

Trenchless Construction 
SEI/ASCE/SFPE 29-99 Standard Calculation Methods 

for Structural Fire Protection 
SEI/ASCE 30-00 Guideline for Condition Assessment 

of the Building Envelope 
SEI/ASCE 31-03 Seismic Evaluation of Existing 

Buildings 
SEI/ASCE 32-01 Design and Construction of Frost- 
Protected Shallow Foundations 
EWRI/ASCE 33-01 Comprehensive Transboundary 

International Water Quality Management 

Agreement 
EWRI/ASCE 34-01 Standard Guidelines for Artificial 

Recharge of Ground Water 
EWRI/ASCE 35-01 Guidelines for Quality Assurance 

of Installed Fine-Pore Aeration Equipment 
CI/ASCE 36-01 Standard Construction Guidelines for 

Microtunneling 
SEI/ASCE 37-02 Design Loads on Structures During 

Construction 
CI/ASCE 38-02 Standard Guideline for the 

Collection and Depiction of Existing Subsurface 

Utility Data 
EWRI/ASCE 39-03 Standard Practice for the Design and 

Operation of Hail Suppression Projects 



ASCE/EWRI 40-03 Regulated Riparian Model Water and Operation of Supercooled Fog Dispersal 

Code Projects 

ASCE/EWRI 42-04 Standard Practice for the Design ASCE/EWRI 45-05 Standard Guidelines for the 
and Operation of Precipitation Enhancement Design of Urban Storm water Systems 

Projects ASCE/EWRI 46-05 Standard Guidelines for the 

ASCE/SEI 43-05 Seismic Design Criteria for Installation of Urban Stormwater Systems 

Structures, Systems, and Components in Nuclear ASCE/EWRI 47-05 Standard Guidelines for the 
Facilities Operation and Maintenance of Urban Stormwater 

ASCE/EWRI 44-05 Standard Practice for the Design Systems 



CONTENTS 

Foreword vii 

Acknowledgments ix 

1 .0 GENERAL 1 

1.1 Scope 1 

1 .2 Existing Applications 1 

1 .3 New Applications 1 

1 .4 Reference Standards 1 

1 .5 Definitions 2 

2.0 OPERATING ENVIRONMENT 3 

2.1 Ambient Conditions 3 

2.1.1 Temperature and Humidity 3 

2.1.2 Wind 3 

2.1 .3 Precipitation 3 

2.1.4 Lightning 4 

2.1 .5 Existing Atmospheric Pollution 4 

2.1.6 Solar Heat Load 4 

2.1.7 Flood Zones 4 

2.1 .8 Electromagnetic Background 4 

2.2 Induced Environmental Parameters 4 

2.2.1 Exterior Airborne Noise 4 

2.2.2 Structure-Borne Noise/ Vibration 4 

2.2.3 Electromagnetic Radiation 4 

3.0 SAFETY REQUIREMENTS 5 

3.1 System Safety Program 5 

3. LI System Safety Program Plan 5 

3.1.2 Hazard Resolution Process 5 

3.2 Safety Principles 6 

3.3 Automatic Train Control System Fail-Safe Design 6 

3.3.1 Intrinsic Fail-Safe Design 6 

3.3.2 Alternatives to Intrinsic Fail-Safe Design 6 

3.4 Verification and Validation 8 

4.0 SYSTEM DEPENDABILITY 8 

4.1 Service Reliability 9 

4.1. 1 Service Interruptions 9 

4. 1 .2 Exceptions 9 

4.2 Service Maintainability 9 

4.3 Service Availability 10 

5.0 AUTOMATIC TRAIN CONTROL 10 

5.1 Automatic Train Protection Functions 10 

5.1.1 Presence Detection 10 

5. 1 .2 Separation Assurance 10 

5.1.3 Unintentional Motion Detection 11 

5.1.4 Overspeed Protection 1.1 

5. 1.5 Overtravel Protection 13 

5.1.6 Parted Consist Protection 11 

5.1.7 Lost Signal Protection 11 

5.1.8 Zero Speed Detection 11 

5.1.9 Unscheduled Door Opening Protection 11 

5.1.10 Door Control Protection Interlocks 12 



5.1.1.1 Departure Interlocks 12 

5.1.12 Direction Reversal Interlocks 12 

5 J ...13 Propulsion and Braking Interlocks 12 

5.1.14 Guideway Switch Interlocks 12 

5.2 Automatic Train Operation Functions 13 

5.2.1 Motion Control 13 

5.2.2 Programmed Station Stop , 13 

5.2.3 Door and Dwell-Time Control 13 

5.3 Automatic Train Supervision Functions 13 

5.3.1 Constraints on Automatic Train Supervision 13 

5.3.2 Status and Performance Monitoring 14 

5.3.3 Performance Control and Override 14 

5.4 Manual Operation Limitations . 16 

6.0 AUDIO AND VISUAL COMMUNICATIONS . 16 

6 A Audio Communication 16 

6.1.1 Station Public Address 16 

6.1.2 Emergency Station and Wayside Communications 16 

6.1.3 Train Voice Communications and Public Address 16 

6.1.4 Operations and Maintenance Personnel Communications 17 

6.1 .5 Recording of Audio Transmissions 17 

6.1.6 Intelligibility of Audio Communications 17 

6.2 Video Surveillance , 17 

6.2.1. Central Control Equipment 17 

6.2.2 Passenger Station Equipment 18 

6.23 Recording of Video Transmissions 18 

6.3 Passenger Information Devices 18 

6.3.1 Vehicle 18 

6.3.2 Stations 18 

ANNEX A SYSTEM SAFETY PROGRAM REQUIREMENTS 19 

A.l System Safety Program Plan 19 

A..2 Preliminary Hazard Analysis 20 

A. 3 Subsystem Hazard Analysis 21 

A.4 System Hazard Analysis 22 

A.5 Operating and Support Hazard Analysis 22 

ANNEX B BIBLIOGRAPHY 25 

INDEX 27 



FOREWORD 



In 2003, the Board of Direction approved 
the revision to the ASCE Rules for Standards 
Committees to govern the writing and maintenance 
of standards developed by the Society. All such stan- 
dards are developed by a consensus standards pro- 
cess managed by the Society's Codes and Standards 
Committee (CSC). The consensus process includes 
balloting by a balanced standards committee made 
up of Society members and nonmembers, balloting 
by the membership of the Society as a whole, and 
balloting by the public. All standards are updated 
or reaffirmed by the same process at intervals not 
exceeding five years. 

This standard was developed for Automated People 
Movers. 

An Automated People Mover (APM) is defined 
as a guided transit mode with fully automated opera- 
tion, featuring vehicles that operate on guideways with 
exclusive right-of-way. 

This standard has been prepared by the ASCE 
Automated People Mover Standards Committee. 
It establishes the minimum set of requirements nec- 
essary to achieve an acceptable level of safety and 
performance for an APM system. As such, it may be 
used in the safety certification process. The overall 



goal of this standard is to assist the industry and the 
public by establishing standards for APM systems. 

This standard includes minimum requirements for 
the design, construction, operation, and maintenance of 
APM systems. 

This standard has no legal authority in its own right 
but may acquire legal standing in one or more of the 
following ways: 



1 . Adoption by an authority having jurisdiction 

2. Reference to compliance with the standard as a 
contract requirement 

3. Claim by a manufacturer or manufacturer's agent 
of compliance with the standard 

This standard has been prepared in accordance with 
recognized engineering principles and should not be 
used without the user's competent knowledge for a 
given application. The publication of this standard by 
ASCE is not intended as warrant that the information 
contained therein is suitable for any general or specific 
use, and the Society takes no position respecting the 
validity of patent rights. The user is advised that the 
determination of patent rights or risk of infringement is 
entirely their own responsibility. 



ACKNOWLEDGMENTS 



The American Society of Civil Engineers (ASCE) 
acknowledges the devoted efforts of the Automated 
People Mover Standards Committee under the Lifeline 
Standards Council of the Codes and Standards 
Committee. This group comprises individuals from 
many backgrounds including: consulting engineer- 
ing, research, transit agencies, airports, transit system 
design and manufacturing, education, government, and 
private practice. 

This standard was prepared through the consensus 
standards process by balloting in compliance with 
procedures of ASCE's Codes and Standards Activity 
Council. Those individuals who serve on the Automated 
People Mover Standards Committee are: 

Thomas J. McGean, Chair* 

Tecid L. Snyder, Vice-Chair* 

Lawrence L. Smith, Secretary* 

Joseph D. Abbas 

Douglas T. Baird 

Frank P. Bares 

Cheryl Boehm 

Murthy V. A. Bondada 

Jon Brackpool 

Pierre A. Brunet 

David B. Campbell 

John J. Champ 

Yves Clarissou 

Redjean Gere 

Frank Culver 

Peter DeLeonardis 

John Dexter 

Paul Didrikson 

Didier Dupre 

Charles P. Elms 

Robert W. Falvey 

Jimmy E. Fletcher 

Matthias Frenz 

Henri Frey 

Darin Friedmann 

Antonio Garcia 

Franklin D. Gates 

Robert R. Griebenow 

Greg B . Hale 

Albert W. Hartkom 

William T. Hathaway 

James Hoelscher 

Gary W. Houts 

Victor Howe 

Alex R. Inserto 

James Mike Johnson 



John Kapala 
Ronald D. Kangas* 
Alexander Klimmer 
J. Sam Lott 
Martin V. Lowson 
Stanford W. Lynch 
Charles Martin 
Diane I. Morse 
Jorg Nalike 
Josef Nejez 
Hiroshi Ogawa 
Richard R. Prell 
Felix Rhyner 
Michael R. Riseborough 
William Rourke 
Obe Schrader 
William P. Showalter 
Michael Shumack 
David Taliaferro 
David Thurston 
James M. Tuten 
Michael S. Venter 
Gert Vestergaard 
Rudiger Vom Hovel 
Thomas Waldron 
Ray Warner 
Lloyd J. Welch 
Steven K. Yates 

* Committee Control Group Members 

The following Working Group Leaders are 
especially acknowledged for their efforts in. drafting 
specific sections of the standard and shepherding 
them through the consensus process. 

General: Michael Shumack 

Operating Environment: Drafting: Maury Sulkin; 

Reaffirmation: John Dexter 
Safety Requirements: Drafting: James Hoelscher 

with Ronald Kangas, William Hathaway, 

and Charles Martin; Reaffirmation: Jim 

Hoelscher et al. 
System Dependability: Drafting: J, Sam Lott; 

Reaffirmation: Joe Abbas 
Automatic Train Control: Drafting: Charles Martin 

with Robert Good; Reaffirmation: Charles Martin 

with Jim Hoelscher and Al Hartkorn 
Audio and Visual Communications: Drafting: Charles 

Elms; Reaffirmation: Charles Elms with Paul 

Didrickson. 



ASCE vStaff support was provided by John was provided by BAA, United Kingdom; Bombardier, 
Esslinger. Michael Shumack provided Configuration Inc.; Clark County, Nevada; Denver International 
Control. Support for our membership mailings and Airport; Doppelmayr Cable Car GmbH & Co.; Horton 
communication was Frank Culver and Lawrence Smith. Automatics; McCarran International Airport; Miami- 
Website was provided by Atlanta Hartsfield International Dade Transit; Washington Group International; and Walt 
Airport and Michael Shumack. Support for meetings Disney Enterprises. 



Automated People Mover Standards— Part 1 



1.0 GENERAL 

1.1 SCOPE 

This standard has been divided into four parts to 
expedite the approval and release process as well as to 
facilitate ease of use. This document constitutes Part 1 
of the Standard. 

Parts 1 , 2 and 3 cover a mini muni set of require- 
ments for design of an automated people mover (APM) 
with an acceptable level of safety and performance. 

Part 1 consists of: 

1. General 

2. Operating Environment 

3. Safety Requirements 

4. System Dependability 

5. Automatic Train Control (ATC) 

6. Audio and Visual Communications 

Part 2 consists of: 
1. General 

7. Vehicles 

8. Propulsion and Braking 

Part 3 consists of: 
1. General 

9. Electrical 

10. Stations 

11. Guideways 

Part 4 is a minimum set of requirements for maintain- 
ing an acceptable level of safety and performance for an 
APM in passenger operation. 

Part 4 consists of: 

12. Security 

13. Emergency Preparedness 

14. System Verification and Demonstration 

15. Operations, Maintenance, and Training 

16. Operational Monitoring 

1.2 EXISTING APPLICATIONS 

Existing installations and projects in progress prior 
to the effective date of this standard need not comply 
with the new or revised requirements of this edition, 
except where specifically required by the authority 
having jurisdiction. Existing APMs, when completely 
removed and reinstalled, shall be classified as new 
installations. 

1.3 NEW APPLICATIONS 

New installations begun alter the effective date of 
this standard shall comply with the new or revised 
requirements of this edition. 



1.4 REFERENCE STANDARDS 

The following documents or portions thereof are 
incorporated by reference in this Standard. 

ANSI Publications: American National Standards 
Institute, Attn: Customer Service, 11 West 42nd Street, 
New York, NY 10036, phone (212) 642-4900. 

ANSI SI .4-1983, Specification for sound level meters 

(cited in Section 2.2.1) 
ANSI S3. 29-1 983, Guide to the evaluation of human 

exposure to vibration in buildings (cited in Section 

2.2.2) 

IEEE Publications: The Institute of Electrical and 
Electronic Engineers, 3 Park Avenue, New York, NY 
10016-5997, phone (800) 678-4333. 

IEEE Std 1474.1-2004, IEEE standard for communi- 
cations-based train control (CBTC) performance 
and functional requirements (cited in Section 5.0) 

NFPA Publication: National Fire Protection Asso- 
ciation, Customer Service Department, 1 Battery march 
Park, P.O. Box 9101, Quincy, MA 02269-9 101, phone 
(800) 344-3555 

NFPA 72-2002 National fire alarm code (cited in 

Section 6.1.6) 
NFPA 130-2003 Standard for fixed guidew ay transit 

and passenger rail systems (cited in Section 6.1,2) 

UL Publication: Underwriters Laboratories, Pub- 
lications, 333 Pfingsten Road, Northbrook, IL 60062, 
phone (847) 272-8800 

UL96A-1 1th edition, 2001, Installation requirements 
for lightning protection systems (cited in Section 
2.1.4) 

UL $13—1993- Commercial audio equipment (cited in 
Section 6.1.3) 

Telecommunications Industry Association Pub- 
lication: Telecommunications Industry Association, 
2500 Wilson Blvd., Suite 300, Arlington VA 22201 , 
phone (703) 907-7700 

TIA/EIA Telecommunications Systems Bulletin 

TSB-88-A-1, January 2002, Wireless communications 
systems -performance in noise and interference- 
limited situations-recommended methods for 
technology-independent modeling, simulation and 
verification-addendum I (cited in Section 6.1.6) 

Code of Federal Regulations: U.S. Government 
Printing Office, Superintendent of Documents, 732 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



North Capitol Street, N.W., Washington, DC 20401, 
phone (202) 512-1800 

CFR, Title 47, Chapter I, Part 15, Radio frequency 

devices (cited in. Section 2.2.3) 
CFR, Title 47, Chapter I, Part 90, Subparts S and T, 

Private land mobile radio services (cited in 

Section 2.2.3) 

Military Standards: Defense Printing Service, 
Building A, 700 Robbins Avenue, Philadelphia, PA 
19111, phone (215) 697-2179 or 2667 

MIL-STD-461E, Requirements for the control of 
electromagnetic emissions and susceptibility (cited 
in Section 2.1.8) 

MIL-STD-810 F, Environmental test methods and 
engineering guidelines (cited in Section 2.1.5) 

NOAA Publication: National Climatic Data Center, 
151 Patton Ave., Room 120, Ashland, NC 28801-0900, 
phone (828) 271-4800 

National Oceanic and Atmospheric Administration, 
Local climatologic data, annual summary with 
comparative data, updated annually (cited in 
Section 2.1) 

Gale Research Publication: Gale Research Com- 
pany, P.O. Box 33477, Detroit, MI 48232, phone (800) 
877-4253, Ext. 5477 

Richard A. Wood, Ph.D. Weather of U.S. cities, Fifth 
Edition, Vols. 1 and 2, 1996 (cited in Section 2.1) 

1.5 DEFINITIONS 

Automated People Mover (APM): A guided transit 
mode with fully automated operation, featuring vehicles 
that operate on guideways with exclusive right-of-way. 

Automatic Train Control (ATC): The system for 
automatically controlling train movement, enforc- 
ing train safety, and directing train operations. ATC 
includes subsystems for automatic train operation 
(ATO), automatic train protection (ATP) and automat- 
ic train supervision (ATS). 

Automatic Train Operation (ATO): The sub- 
system within the automatic train control system that 
performs any or all of the functions of speed regula- 
tion, programmed stopping, door and dwell-time 
control, and other functions otherwise assigned to the 
train operator. 

Automatic Train Protection (ATP): The subsys- 
tem within the automatic train control system that 
provides the primary protection for passengers, person- 
nel, and equipment against the hazards of operations 
conducted under automatic control. 



Automatic Train Supervision (ATS): The sub- 
system within the automatic train control system that 
monitors and manages the overall operation of the 
APM system and provides the interface between the 
system and the central control operator. 

Braking, Emergency: Irrevocable braking to a 
complete stop at a rate never less than the minimum 
guaranteed rate. 

Braking, Service: Braking of vehicle motion at a 
rate that is regarded as comfortable for repeated use in. 
service stopping and/or slowing. 

Central Control: The location where automatic 
train supervision is accomplished for the entire transit 
system; the train command center. 

Central Control Operator: Any person authorized 
to operate the APM system from Central Control. 

Consist: The makeup or composition (number and 
specific identity) of a train of vehicles. 

Dwell Time: The total time the train services the sta- 
tion measured as the time from door open command to 
the time the doors are closed and locked. 

Dynamic Sign: A sign on which the messages can 
be changed. 

Fail-Safe: A characteristic of a system or its ele- 
ments whereby any failure or malfunction affecting 
safety will cause the system to revert to a state that is 
known to be safe. 

Failure: An inability to perform an intended func- 
tion. 

Free Field: An isotropic, homogeneous sound field 
that is free from all bounding surfaces. 

Hazard: An existing or potential condition that can 
result in an accident. 

Headway: The time separation between two trains, 
both traveling in the same direction on the same 
guide way, measured from the time the head end of the 
leading train passes a given reference point to the time 
the head end of the train immediately following passes 
the same reference point. 

Interlock: An arrangement of control elements so 
interconnected that their operations must succeed each 
other in proper sequence. 

Jerk: The time rate of change of acceleration or 
deceleration. 

MTBHE: Mean time between hazardous events. 

Overspeed: Train speed that is in excess of the 
speed limit as defined for the relevant point on the 
guideway. 

Overtravel: Continued movement of a train beyond 
a specified stopping point. 

Passenger Compartment: If a vehicle is divided 
into separate areas between which passengers are 
either unable or not permitted to move, each such area 
is defined as a passenger compartment. If the vehicle is 



ANS1/ASCE/T&DI 21-05 



not so divided, then the entire vehicle is the passenger 
compartment. 

Permissive Decision: Granting permission or au- 
thority for the system or a part of the system to enter 
any state other than the safe state. 

Risk: A measure of the seventy and likelihood of an 
accident. 

Safe State: System state that is deemed acceptable 
by the hazard resolution process (see Section 3.1 .2). 

Safety Critical: A designation placed on a system, 
subsystem, element, component, device, or function de- 
noting the satisfactory operation of which is mandatory 
to mitigation of unacceptable and undesirable hazards 
as defined in Section 3.4, Table 3-1. 

Separation: The distance between the adjacent 
ends of two trains traveling along the same guideway 
as measured along the guideway centerline. 

Shall: In this standard, the word "shall" denotes a 
mandatory requirement. 

Should: In this standard, the word "should" de- 
notes a recommendation. 

Subsystem: A major functional subassembly or 
grouping of items or equipment that is essential to 
operational completeness of a system. 

System: A composite of people, procedures, facili- 
ties, and/or equipment that are integrated to perform a 
specific operational task or function within a specific 
environment. 

System Dependability: The overall set of criteria 
used to measure the performance of an operating sys- 
tem in terms of reliability, maintainability, and avail- 
ability. 

System Safety: The application of engineering and 
management principles, criteria, and techniques to 
optimize all aspects of safety within the constraints of 
operational effectiveness, time, and cost throughout all 
phases of the system life cycle. 

Train: A consist of one or more contiguous ve- 
hicles combined into an operating unit. 

Vehicle: The smallest unit that can operate alone 
or that comprises one of the basic building blocks of a 
train. 

Zero Speed: A specified speed below which Auto- 
matic Train Control considers a train to be stopped. 



2.0 OPERATING ENVIRONMENT 

There are two aspects to operating environment con- 
siderations. One deals with the existing environmental 
conditions in which the system must operate (ambient) 
and the other deals with the environment resulting from 
the existence and operation of the system (induced). 
Both of these aspects are covered herein. 



2.1 AMBIENT CONDITIONS 

One of the following two sources of historical 
climatic data shall be considered when specifying 
design climatic values: Source Number 1 is a basic 
compilation of low, high, and mean values of tem- 
perature, humidity, steady and gusting winds, rainfall 
rates, and other climatic characteristics as compiled by 
the National Oceanic & Atmospheric Administration 
(NOAA). Source Number 2 summarizes the NOAA. 
data in convenient form. 

1 . Local climatologic data, annual summary with 
comparative data, national oceanic and 
atmospheric administration, updated annually. 

2. Weather of U.S. cities, Fifth Edition, Volumes 1 and 
2, Richard A. Wood, PhD, Gale Research Company, 
Detroit, Michigan, 1996; Library of Congress Card 
Number 87-13869, ISBN 0-8103-5525^6. 

Where the proposed site is located outside of the 
area of coverage of the above documents, or within a 
microclimate, appropriate local weather data shall be 
used in lieu of the above sources. 

2.1.1 Temperature and Humidity 

The system shall be designed to, and capable of 
operating in, site temperature conditions that represent 
the 50-year highest and lowest temperature of record 
and at a noncondensing relative humidity of 95% at a 
temperature of 30 °C (86 °F). 

2.1.2 Wind 

Maximum wind speeds shall be established for at 
least the following conditions: 

1 . Normal system operation 

2. Manual operation 

3. System survival 

The maximum wind speed for normal system 
operation shall be used as the design wind speed for 
safe automated system operation. If this wind speed is 
exceeded, automated operation shall not be permitted 
or shall be appropriately degraded. 

The maximum wind speed for manual system op- 
eration shall be used as the design wind speed for safe 
manual operation. If this wind speed is exceeded, the 
system shall not be permitted to operate. 

The maximum wind speed for system survival shall 
be the design wind speed for all structures. This wind 
speed shall be that used by local building codes. 

2.13 Precipitation 

If the system is intended for operation while subject- 
ed to rainfall, snowfall, and icing, it shall be designed 
for operation at rates consistent with historical data. 



3 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



2.1 .4 Lightning 

Protection shall be provided against lightning inci- 
dence in the area for those systems that are susceptible. 
Such protection should be in compliance with Instal- 
lation requirements for lightning protection systems, 
UL96A, 11th edition, 2001. 

2.1.5 Existing Atmospheric Pollution 

The system design shall tolerate atmospheric pollut- 
ants that exist at the site. Such pollutants may include 
dust, dirt, salt, ozone, smog, and other matter specific 
to the site. In the cases of dust and dirt, compliance 
shall be with Environmental test methods and engi- 
neering guidelines, MIL-STD-810 R method 510.4. 

2.1.6 Solar Heat Load 

The design of systems that are subject to solar 
heating shall be based on a peak, direct solar heat gain 
appropriate to the site. Material selection shall minimize 
the deleterious effects of ultraviolet radiation. 

2.1.7 Flood Zones 

Flood levels shall be specified as the 100-year flood 
level. The system shall be capable of surviving flood- 
ing with minimal damage to structure and equipment. 
Equipment and facility elements that, can be damaged 
by flooding shall be protected or installed above the 
flood plain elevation. 

2.1.8 Electromagnetic Background 

The system and all of its components shall be elec- 
tromagnetically compatible with the site environment at 
the initiation of system operation. All system electrical 
and electronic equipment shall function satisfactorily 
in the presence of electromagnetic emissions generated 
externally at the site. The environment may include, but 
is not limited to: communications systems, microwave 
facilities and transmissions, television and radio trans- 
mitters and repeaters, radar systems, computer equip- 
ment and accessories, traffic control devices, magne- 
tometers, electric motors, controls, power tools, welders, 
x-ray equipment, power substations and equipment, 
automotive vehicles, aircraft, and high voltage power 
lines. The electromagnetic environment particular to the 
site should be determined and the design should provide 
for elimination of the influence of these conditions upon 
the equipment. Compliance shall be in accordance with 
Requirements for the control of electromagnetic emis- 
sion and susceptibility, MIL-STD-461E, Requirement 
Matrix category "Ground, Army." 

2.2 INDUCED ENVIRONMENTAL 
PARAMETERS 

The system shall be operated, stored, and main- 
tained without imposing on the site any condition that 
exceeds the limitations defined herein. 



2.2.1 Exterior Airborne Noise 

The following exterior noise levels emanating from 
the system with all equipment operating normally 
should not be exceeded under the conditions defined. 
Exterior noise levels shall be measured using at least 
a Type II instrument, as defined in Specification for 
sound level meters, ANSI Standard S 1.4- 1983, and 
shall be set for fast or slow response as indicated. 

1 . Vehicle entering/leaving a station — inside station, 

1 .5m (5 feet) from platform edge and 1 .5m (5 feet) 
above platform surface: 76 dBA (slow response). 

2. Vehicle stopped in station — inside station, 1 .5m (5 
feet) from platform edge and 1 .5m (5 feet) above 
platform surface: 74 dBA (slow response). Vehicle 
doors and platform doors (if provided) shall be fully 
open. 

3. Under all normal operating conditions in a free 
field, 15m (50 feet) from guideway centerline and 
from .1 .5m (5 feet) above ground level to 1 ,5m (5 
feet) above guideway running surface: 76 dBA (fast 
response). 

Noticeable pure tones are not permitted. A pure 
tone is defined to exist when one 1/3-octave band 
exceeds the arithmetic average of the two adjacent 
bands by 4 dBA or more in the range of frequencies 
between 250 and 8,000 Hz. If an adjacent band con- 
tains a pure tone, the next closest band without a pure 
tone shall be used in its place. A noticeable pure tone 
shall be considered to exist when the 1/3-octave band 
containing the pure tone contributes more than 1.0 
dBA to the overall dBA level. 

More stringent noise requirements may be neces- 
sary to satisfy local environmental limitations. 

2.2.2 Structure-Borne Noise/Vibration 

System-induced vibrations shall be imperceptible at 
or in surrounding buildings. The threshold of percep- 
tion shall be as defined by Guide to the evaluation 
of human exposure to vibration in buildings, ANSI 
Standard S3.29-1983. 

2.2.3 Electromagnetic Radiation 

The system shall be electron) agnetically compatible 
with its environment. The system shall not produce 
electromagnetic emissions, whether conducted, radi- 
ated, or induced, that interfere with normal operation 
of electromagnetic devices or equipment used in and 
around the site at the initiation of system operation. 

All system transmitting and receiving equipment, 
such as for automatic train control (ATC) and audio 
and visual communications, shall meet the licens- 
ing requirements of the Code of Federal Regulations, 
Title 47, Chapter L Part 90, Private Land Mobile 



ANSI/ASCE/T&DI 21-05 



Radio Services, Subparts S and T; and the interference 
requirements defined in Title 47, Chapter I, Part 15, 
Radio Frequency Devices. 



equivalent. The SSPP shall, as a minimum, identify the 
scope of the System Safety Program activities including 
those identified in Section 3.1. 



3.0 SAFETY REQUIREMENTS 

A System Safety Program, per Section 3.1, shall 
be instituted during the system planning/design phase 
and continue throughout the system construction and 
operation. The system safety concept shall emphasize 
the prevention of accidents by resolving hazards in a 
systematic manner in accordance with Section 3.1 .2, 
Hazard Resolution Process. 

3.1 SYSTEM SAFETY PROGRAM 

A System Safety Program shall be implemented to 
identify and resolve hazards. The owner shall provide 
for the development of a System Safety Program Plan 
to assist in implementing and documenting that pro- 
gram. The System Safety Program Plan shall identify 
the responsibilities of all parties for implementing a 
System Safety Program. 

The System Safety Program and Plan shall: 

1 . Have as their objective to provide for the safety 
of the passengers, employees, general public, and 
equipment 

2. Encompass all system elements and organizations 
within the automated people mover (APM) system 

3. Identify the safety roles and responsibilities of all 
organizational elements, and require accountability 

4. Designate one individual to be responsible for the 
safety of the system who has a clearly defined role 
and responsibilities established through a written 
policy 

5. Contain a hazard resolution process that includes 
the procedures necessary to identify and resolve 
hazards throughout the system life cycle 

6. Provide for and maintain owner/management com- 
mitment in the form of an adopted policy and the 
allocation of resources 

The individual identified to carry out the System 
Safety Program shall have clear evidence of the author- 
ity to insure its implementation and shall report directly 
to top management. 

3.1.1 System Safety Program Plan 

A System Safety Program Plan (SSPP) shall be de- 
veloped during the planning/design phase of the APM 
project and maintained current throughout the APM 
system life cycle. The SSPP shall be prepared in gen- 
eral accordance with Annex A, System Safety Program. 
Requirements, A.l (System Safety Program Plan), or 



3.1.2 Hazard Resolution Process 

The hazard resolution process shall be initiated by 
defining the physical and functional characteristics of 
the APM system to be analyzed. These characteristics 
shall be presented in terms of the major elements that 
make up the system and its environment, including 
equipment, facilities, procedures, and people. 

The hazards shall be identified. The techniques and 
methods used to identify the hazards shall include: 

1. Data from previous accidents or operating experi- 
ence 

2. Expert opinion and hazard scenarios 

3. Checklists of potential hazards 

4. Previous hazard analyses 

5. Other analysis techniques as appropriate 

All identified hazards shall be assessed in terms of 
the severity or consequence of the hazard and the prob- 
ability of occurrence. 

Risk assessment estimates (Section 3.4, Table 3-1) 
shall be used as the basis in the decision-making process 
to determine whether individual APM system or subsys- 
tem hazards shall be eliminated, mitigated, or accepted. 
Hazards shall be resolved through a design process that 
emphasizes the elimination of the hazard. Resolution 
strategies or countermeasures to be employed, listed in 
order of decreasing preference, shall be the following: 

1 . Design to eliminate hazards 

2. Design to control hazards 

3. Use safety devices 

4. Use warning devices 

5. Implement special procedures 

6. Accept the hazard 

7. Eliminate the system/subsystem/equipment 

This process shall include full documentation of the 
hazard resolution activities. The effectiveness of the 
countermeasures shall be monitored to determine that no 
new hazards are introduced. In addition, whenever sub- 
stantive changes are made to the system, analyses shall 
be conducted to identify and resolve any new hazards. 

3.1,2.1 Hazard Analyses 

Hazard analyses shall be employed to assist in 
the evaluation of potential hazards and to document 
their resolution. As a minimum, a Preliminary Haz- 
ard Analysis (PHA) shall be conducted for each new 
APM system project. Other detailed analyses including 
Subsystem Hazard Analysis (SSHA), System Hazard 



AUTOMATED PEOPLE MOVER STANDARDS-— PART 1 



Analysis (SHA) and Operating and Support Hazard 
Analysis (O&SHA) shall also be conducted if man- 
dated by the SSPP. These analyses shall be conducted 
in general accordance with Annex A, System Safety 
Program Requirements, sections A.2 (PHA), A. 3 
(SSHA), A.4 (SHA), and A.5 (O&SHA), or equivalent, 
respectively. 

3.2 SAFETY PRINCIPLES 

The following safety principles shall be observed 
in the APM system (see Section 3.4, Table 3-1, for the 
definition of unacceptable and undesirable hazards): 

1. When the system is operating normally there shall 
be no unacceptable or undesirable hazard conditions. 

2. The system design shall require positive actions 
to be taken in a prescribed manner to either begin 
system operation or continue system operation. 

3. The safety of the system in the normal automatic 
operating mode shall not depend on the correctness 
of actions or procedures used by operating person- 
nel. 

4. There shall be no single-point failures in the system 
that can result in an unacceptable or undesirable 
hazard condition. 

5. If one failure combined with a second failure can 
cause an unacceptable or undesirable hazard con- 
dition, the first failure shall be detected before the 
second failure occurs. 

6. Software faults shall not. cause an unacceptable or 
undesirable hazard condition. 

7. Unacceptable hazards shall be eliminated by design. 

8. Maintenance activities required to preserve risk levels 
(Section 3.4, Table 3-1 ) shall be prescribed to the 
individual responsible for the System Safety Program 
(Section 3.1) during the design phase. These main- 
tenance activities shall be minimized in both the fre- 
quency and in the complexity of their implementation. 
The personnel qualifications required to adequately 
implement these activities shall also be identified. 

33 AUTOMATIC TRAIN CONTROL SYSTEM 
FAIL-SAFE DESIGN 

All safety critical elements of the automatic train 
control (ATC) system (see Section 5.0, Automatic Train 
Control) shall be designed and implemented in ac- 
cordance with fail-safe principles and shall use one or 
more of the techniques described below, or equivalent, 
to detect potentially unsafe failure modes and force the 
system to a known safe state. Fail-safe principles shall 
be realized by designing the system to have intrinsi- 
cally safe failure characteristics or by designing the 
system with verifiable techniques that detect potentially 
unsafe failures and ensure that the system reverts to a 



known safe state. Documentation of the means used and 
proof that the fail-safe principle has been met shall be 
required for every safety critical system or subsystem. 

3.3.1 Intrinsic Fail-Safe Design 
Intrinsically fail-safe systems shall be designed 

using verifiable physical, mechanical, and/or electrical 
component characteristics. For these designs, the effect 
of every relevant failure mode on the operation of the 
system shall be considered, analyzed, and documented 
in a comprehensive failure modes and effects analysis, 
or equivalent. 

3.3.2 Alternatives to Intrinsic Fail-Safe Design 
Many control system designs utilize integrated 

circuits, microprocessors, and software to achieve the 
required functional characteristics. Designs that do not 
exhibit intrinsically safe failure characteristics shall 
use one or more of the following techniques (Section 
3.3.2.1 through Section 3.3,2.4). The effectiveness and 
completeness of these techniques shall be documented 
and proven as part of system Validation and Verifica- 
tion (Section 3.4). The measure of the technique's 
effectiveness shall assess its ability to detect fault 
conditions and assure that the technique is installed as 
designed and is required for the system to operate. 

33.2.1 Checked-Redundancy 

The application of the checked-redundant principle 
shall include at least two parallel systems perform- 
ing identical functions. A means shall be provided to 
compare the output of the parallel systems. If the two 
systems do not agree, then the safety critical function 
being performed shall default to a known safe state, 
The following characteristics shall be incorporated and 
verified in the checked-redundant design: 

1 . The checking process shall assure that "agreement" 
shall not be indicated unless the redundant outputs 
agree, Lack of "agreement" of the checking process 
shall result in a known safe state. 

2. The checking process shall include the comparison 
of all safety critical results of all the safety critical 
functions. 

3. Any failure that could affect system safety in 
either of the redundant units shall result in a known 
safe state. 

4. The redundant units shall be independent from each 
other so that no common environmental or power 
fluctuations, errors, and/or faults can cause unaccept- 
able or undesirable hazards (Section 3.4, Table 3-1). 

5. The checking process shall be comprehensive in 
coverage (functions tested and the rate at which 
functions are tested) to ensure that the probability of 



ANSI/ASCE/T&DI 21-05 



failures or compensating failures producing unac- 
ceptable or undesirable hazards is at an acceptable 
level (Section 3.4, Table 3-1). 
6. For units employing software-programmed ele- 
ments, the software shall be shown to be free from 
errors including any errors introduced during the 
compilation process by proven principles/practices 
of verification and validation (Section 3.4). 

3 J. 2,2 N -Version Programming 

The application of the N-version programming 
principle shall require at least two parallel programmed 
systems performing identical functions. The software 
in each system shall be unique and independently 
written by different persons/teams, using different 
languages and tools. The hardware may or may not 
be identical, or may include both programmed sys- 
tems within one hardware processing unit. A means 
shall be provided to compare the output of the parallel 
programmed systems. If the two systems do not agree, 
then the safety critical function being performed shall 
default to a known safe state. The following character- 
istics shall be incorporated and verified in the design: 

1. The checking process shall be fail-safe. "Agree- 
ment" shall not be indicated unless the redundant 
outputs agree. Lack of "agreement" of the checking 
process shall result in a known safe state, 

2. The checking process shall include the comparison 
of all safety critical results of all the safety critical 
functions. 

3. Any failure that could affect system safety in either 
of the units shall result in a known safe state. 

4. The parallel programmed systems shall be indepen- 
dent from each other so that no common environ- 
mental or power fluctuations, errors, and/or faults 
can cause unacceptable or undesirable hazards 
(Section 3.4, Table 3-1). 

5. The checking process shall be comprehensive in 
coverage (functions tested and the rate at which 
functions are tested) to ensure that the probability of 
failures or compensating failures producing unac- 
ceptable or undesirable hazards is at an acceptable 
level (Section 3.4, Table 3-1). 

6. The software processed by the parallel programmed 
systems shall be proven to be independent. 

33.23 Diversity and Self-Checking 

The use of diversity and self-checking concepts 
shall require that all critical functions be performed in 
diverse ways, using diverse software operations and/or 
diverse hardware channels, and that critical system 
hardware be tested with self-checking routines. Per- 
missive outputs shall be allowed only if the results of 



the diverse operations correspond and the self-checks 
reveal no failures. The following characteristics shall 
be incorporated and verified in the design: 

1. The checking of the results of the diverse 
operations shall be fail-safe. Permissive decisions 
shall not be allowed unless the diverse results 
agree. Lack of "agreement" of the diverse checking 
process or of self-checks shall result in a known 
safe state. 

2. The diverse operations and the self-checking 
process shall include the verification of all safety 
critical results of all the safety critical functions. 

3. Any failure that could affect system safety shall 
result in a known safe state. 

4. The diversity and self-checking routines shall be 
comprehensive in coverage (functions tested and 
rate at which functions are tested) to ensure that 
the probability of failures or compensating failures 
producing unacceptable or undesirable hazards is at 
an acceptable level (Section 3.4, Table 3-1). 

5. For units employing software-programmed elements, 
the software shall be shown to be free from errors 
including any errors introduced by the compilation 
process by proven principles/practices of Verification 
and Validation (Section 3.4). 

33.2. 4 Numerical Assurance 

The numerical assurance principle shall require 
permissive decisions to be represented by large unique 
numerical values, calculated by combining numerical 
values representing each of the critical constituents of a 
permissive decision. The following characteristics shall 
be incorporated and verified in the design; 

1 . The numerical values representing the permis- 
sive decisions shall be proven to be unique and to 
require unique values added by each of the critical 
constituents. 

2. All critical processes that do not add unique values 
to the permissive results, per (1), shall generate 
unique numerical values that are verified for cor- 
rectness. 

3. The system calculating the numerical results must 
have no prior knowledge of the correct permissive 
numerical values. 

4. The process used to verify the correctness of the 
numerical results shall be fail-safe. 

5. Any failure that could affect system safety shall 
result in a known safe state. 

6. Lack of correctness of any of the numerical results 
shall result in a known safe state, 

7. The numerical process shall be comprehensive in 
coverage (functions protected by numerical values 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



and the frequency at which the numerical values are 
calculated and verified) to ensure that the probabil- 
ity of failures or compensating failures producing 
unacceptable or undesirable hazards is at an accept- 
able level as defined in Section 3.4, Table 3-1 . 

3.4 VERIFICATION AND VALIDATION 

The design and implementation of all safety criti- 
cal hardware and software elements of the system as 
identified in the Hazard Resolution Process (Section 
3.1 .2) shall be subjected to verification and validation. 
This includes elements designed and implemented in 
accordance with Safety Principles (Section 3.2) and 
Automatic Train Control System Fail-Safe Design 
(Section 3.3). The objective of this verification and vali- 
dation shall be to verify that all safety critical elements 
have been designed and implemented to achieve safe 
operation and to verify the level of safety achieved. 
The verification and validation process shall in- 
clude: 

1 .. The identification of all factors upon which the 
assurance of safety depends. Such factors shall be 
directly associated with the design concept used, 
For example, Checked-Redundancy, N- Version 



Programming, Diversity and Self-Checking, or 
Numerical A ssu ranee. 

2. The identification of all safety critical functions 
performed by the system. 

3. Analyses demonstrating that all dependent factors 
have been satisfied and that each safety critical 
function has been implemented in accordance with 
safety principles. 

The ATC system (see Section 5.0, Automatic Train 
Control) shall in addition to the above, have a calcu- 
lated aggregate MTBHE (total of all catastrophic and 
critical hazards) of 10**8 (10 X E 8) system operating 
hours or greater. System safety documentation shall 
support this aggregate MTBHE calculation and sub- 
stantiate the methodology used to arrive at the result. 



4.0 SYSTEM DEPENDABILITY 



System Dependability is the overall set of criteria 
used to measure the performance of an operating sys- 
tem in terms of reliability, maintainability, and avail- 
ability. It shall be established in accordance with the 
principles outlined in this section. 



TABLE 3-1. Risk Assessment 



Frequency of occurrence 


Hazard Severity 


1 Catastrophic 


11 Critical 


III Marginal 


IV Negligible 


A — Frequent 

B— Probable 
C — Occasional 
D — Remote 
E — Improbable 


IA 


HA 


MA 


IVA 


■ 'Kl&>.:v : 


JIB 


MB 


IVB 


1C 


TIC 


MC 


IVC 


ID 


IID 


HID 


IVD 


IE 


HE 


hie 


IVE 



1A, HA. IIIA, IB, JIB, & IC = Unacceptable. 

MB, IIC, & ID = Undesirable (allowable with agreement from authority having jurisdiction). 

IVA, IVB, IOC. IID, HID. IE, & HE = Acceptable with notification to the authority having jurisdiction. 

HIE, IVC, IVD, & IVE = Acceptable. 

A — Frequent = MTBHE is less than 1,000 operating hours. 

B — Probable = MTBHE is equal to or greater than 1,000 operating hours and less than 100,000 operating hours. 

C — Occasional = MTBHE is equal to or greater than 100.000 operating hours and less than 1 ,000,000 operating hours. 

D — Remote = MTBHE is equal to or greater than 1,000,000 operating hours and less than 100,000,000 operating hours. 

E — Improbable = MTBHE is equal to or greater than 100.000,000 operating hours. 

It is understood that the quantification of the probability or frequency of occurrence of elements within the safety verification process may be 
required to be subjectively (i.e., qualitatively) determined. All subjectivelly determined elements shall be identified, and the rationale and justifi- 
cation for the estimation shall be described. 

I — Catastrophic ~~ Death, system loss, or severe environmental damage. 

II — Critical = Severe injury, severe occupational illness, or major system or environmental damage. 

Ill — Marginal ~ Minor injury, minor occupational illness, or minor system or environmental damage. 

IV — Negligible = Less than minor injury, occupational illness, or less than minor system or environmental damage. 



ANS1/ASCE/T&DI 21-05 



Throughout this section, references to "system" may 
also be applied to "system subsets" for purposes of 
determining their individual contribution to the overall 
System Dependability. 

Partial service or degraded service adjustments may 
be applied in defining overall System Dependability. 
The use of factors, or ratios, or of separate calcula- 
tions by system subset may be used to provide for such 
adjustments. 

4.1 SERVICE RELIABILITY 

Service reliability is defined as the mean time be- 
tween system or system subset failure (MTBF ). 



MTBF S 
where: 



Operating Hours 
Number of Failures 



-OH /NR 



OH s = Total number of hours of scheduled operation 
over which the service reliability is being deter- 
mined; the Period of Operating Hours 

NF — Number of failures, malfunctions, and operat- 
ing disruptions classified as service interrup- 
tions during the Period of Operating Hours, 
OH 



2. Malfunctions or disruptions due to vandalism, pas- 
senger misuse of the system, or passenger-induced 
delays. 

3. Disruptions caused by unauthorized intrusion of 
persons, animals, or inanimate objects into the 
system, except where the intrusion or failure results 
from the malfunction of any security system or 
devices designed to protect against such intrusion. 

4. Disruptions due to external causes, including loss of 
primary power, police or security directives, force 
majeure, or environmental conditions beyond speci- 
fied limits. 

5. Disruptions for special training, guideway inspec- 
tions, or extended repair purposes that have been 
arranged in advance, 

6. Stoppages due to normal functioning of the auto- 
matic train control system where specified operating 
performance requirements are met. 

4.2 SERVICE MAINTAINABILITY 

Service maintainability is defined as the mean time 
to restore service (MTTR s ) following a system service 
interruption. 

Sum Total Time to Restore Service 



M.TTR, 



Number of Failures 



4.1.1 Service Interruptions 

Service interruptions are those events or failures 
that prevent passenger use of the system or system 
subset as intended. Service interruptions shall be 
defined and weighted in accordance with their rela- 
tive importance. At a minimum, the following types 
of service interruptions shall be included: 

1 . Unscheduled stoppage of one or more trains. 

2. Rerouting of trains due to equipment malfunction so 
that any stations normally served are not. served. 

3. Door malfunctions that prevent passengers from 
entering or exiting trains at stations in automatic 
operation. 

4. Malfunctions that result in potentially hazardous 
operations. 

The owner will specify if erroneous operator actions 
that result in service interruptions are to be included. 

4.1.2 Exceptions 

The following shall not be considered service inter- 
ruptions: 

1. Malfunctions that result in an interruption of nor- 
mal train operations for an interval of time equal 
to or less than a specified period of time (Grace 
Time). 



MTTR s -(l/NFj]T TTRi 



where: 
TTR. = 



NF 



Time to restore service following the ;th ser- 
vice interruption (Downtime Interval) 
Number of failures, malfunctions, and operat- 
ing disruptions classified as service interrup- 
tions during the Period of Operating Hours, 
OH 



In computing the cumulative time to restore and the 
associated number of failures (NF ), only service inter- 
ruptions with Downtime Intervals greater than Grace 
Time (see Section 4.1) shall be included. However, 
once the specified maximum number of Grace Time 
allowances has been reached, no further Grace Time 
shall be allowed and all subsequent service interrup- 
tions shall be included in the calculation of Downtime 
Intervals. In addition, the Downtime Interval for each 
such event shall be the full time interval of cessation 
of service according to the following points: 

1 . The Grace Time shall not be subtracted from the TTR. 
for a countable system service interruption. 

2. The Downtime Interval shall be measured from the 
time of detection of the service interruption until the 
time of restoration of service for the specific train or 



AUTOMATED PEOPLE MOVER STANDARDS— PART I 



equipment that malfunctioned, whether the restora- 
tion is accomplished by automatic means, or by 
repair/replacement of the malfunctioning equipment. 

4.3 SERVICE AVAILABILITY 

Service Availability (A ) is defined as follows: 

MTBF S 
s ~ MTBF S + MTTR S 

Service availability shall be calculated over a 
specified time interval. This calculation of service 
availability is equivalent to the actual operating hours 
(scheduled operating hours minus the accumulated 
downtime) divided by the scheduled operating hours. 

5.0 AUTOMATIC TRAIN CONTROL 

The automatic train control (ATC) subsystem shall 
provide automatic train protection (ATP), automatic train 
operation (ATO), and automatic train supervision (ATS) 
functions. ATP shall provide the primary protection for 
passengers, personnel, and equipment against, the hazards 
of operations conducted under automatic control. ATP 
functions shall have precedence over both the ATO and 
ATS functions. ATO shall control basic operations that 
would otherwise be performed by an operator and does 
so within the protection limits imposed by ATP. The ATS 
shall provide system status information and the means 
for the Central Control operator to monitor and override 
the automatic control for various functions of the system. 

For automatic people mover (APM) systems that 
utilize communications-based train control for ATC, the 
requirements of IEEE PI 474. 1-2004, IEEE standard for 
communications-based train control (CBTC) perfor- 
mance and functional requirements, shall apply in lieu of 
the requirements provided in Section 5.1 and Section 5.2. 

5.1 AUTOMATIC TRAIN PROTECTION 

FUNCTIONS 

All ATP functions shall be designed and implemented 
in accordance with Section 3.2, Safety Principles, and 
Section 3.3, Automatic Train Control System Fail -Safe 
Design. 

5.1.1 Presence Detection 

Presence detection shall be an ATP function if 
required to assure the protection aspects of other ATP 
functions, such as train separation assurance and/or 
guideway switch interlocks. 

As an ATP function, presence detection shall be 
continuous in accordance with Section 5.1.7 in any and 



all automated areas of the guideway. All trains and any 
other vehicles that operate on the system in the pres- 
ence of trains running in automatic operation shall be 
detected regardless of whether they are being operated 
in automatic or manual control. 

The presence-detection function shall be reinitial- 
ized and all trains located and identified by positive 
detection prior to the resumption of automatic opera- 
tion. In no case shall automatic operation be allowed 
based upon manual input of position data. 

5.1.2 Separation Assurance 

Separation assurance shall be a required ATP func- 
tion for any APM system configuration that operates 
trains in following moves around the guideway. 

Separation assurance shall provide protection against 
rear-end collisions for following trains by maintaining a 
zone at the rear of each train that continuously provides 
sufficient stopping distance for the following train as- 
suming that the train ahead can stop instantaneously. 

Stopping distance shall be calculated analytically 
using the cumulative "worst-case" characteristics of 
relevant elements, where worst case pertains to the 
characteristic of the element that results in maximum 
stopping distance. This includes, but is not limited to: 

1. Maximum runaway acceleration 

2. Minimum emergency braking condition 

3. Maximum cumulative time delays 

4. Maximum attainable overspeed 

5. Grade 

6. Worst-case load 

7. Minimum adhesion/traction 

8. Maximum design tail wind 

For stopping distance calculation purposes, mini- 
mum emergency braking condition shall be based 
upon the single worst-case failure conditions of the 
braking system elements as determined by an ap- 
propriate analysis conducted in accordance with the 
requirements of Section 3.1.2.1, Hazard Analyses. 

For APM systems that permit the automated op- 
eration of trains in opposing directions on the same 
track, separation assurance using calculated stopping 
distances for both trains shall apply for the prevention 
of head-on collisions. 

For APM systems that employ automatic coupling, 
the coupling maneuver shall be permitted, provided the 
entire maneuver is conducted under the protection of 
ATP and can be verified and validated to be in accor- 
dance with Section 3.3, Automatic Train Con to I 
System Fail-Safe Design. 

For APM systems where the separation between 
successive trains is physically maintained, as it is in a 



10 



ANSI/ASCE/T&D1 21-05 



cable-propelled system, and where it can be shown by 
analysis according to Section 3.1 .2.1, Hazard Analy- 
ses, that slippage and/or detachment from the physical 
mechanism is possible, then such slippage or detach- 
ment shall be detected and emergency braking shall be 
initiated to stop the slipping/detached train and all other 
trains connected to that mechanism. 

Comparable separation assurance protection shall 
be required for APM systems that employ other means 
to maintain separation between successive trains. 

5.1.3 Unintentional Motion Detection 
Detection of unintentional motion shall be a re- 
quired ATP function for all APM systems. 

The ATP shall initiate emergency braking in the 
event a train is detected to be moving when it has not 
been commanded to move. Emergency braking shall 
also be initiated whenever a train is detected to be mov- 
ing against the permitted travel direction (rollback). 

5.1.4 Overspeed Protection 

Overspeed protection shall be a required ATP func- 
tion for all APM systems. 

Guideway alignment, civil constraints, and train 
traffic conditions as determined by ATP shall define 
the speed limits that represent the maximum allowable 
train speed at any point on the guideway. 

The overspeed protection function shall provide 
speed enforcement, ensuring that the speed of a 
train never exceeds the defined speed limit anywhere 
along the entire route. The overspeed protection 
equipment shall include speed-measuring devices that 
furnish signals that are a measure of the actual speed 
of the train. If ever the actual speed of the train exceeds 
the speed limit, the overspeed protection equipment 
shall immediately command emergency braking. 

5.1.5 Overtravel Protection 

Overtravel protection shall be a required ATP func- 
tion for any APM system configuration that permits the 
automatic operation of trains up to or in close proxim- 
ity to an end-of-guideway terminus. 

Overtravel protection shall be incorporated into, 
or function in conjunction with, overspeed protection 
to prevent trains from overtraveling the end-of-guide- 
way or. if buffers are specified, to prevent trains from 
exceeding the design limits for impact with an end-of- 
guideway buffer. Overtravel protection design shall be 
based on stopping distance calculations using cumula- 
tive "worst-case" characteristics of relevant elements 
as in Section 5.1.2 above. 

5.1.6 Parted Consist Protection 

Parted consist protection shall be an ATP function 
for APM systems that utilize separate vehicles coupled 



together in a consist of two or more vehicles to form 
a train. Parted consist protection shall be required 
regardless of whether the individual vehicles are 
considered to be permanently coupled or whether they 
are routinely uncoupled for maintenance or operational 
purposes. 

Parted consist protection shall detect the uncou- 
pling, detachment, and/or separation of vehicles in 
a consist, and shall thereupon immediately cause all 
vehicles of the previously connected train to brake to a. 
full stop. 

Presence detection, if applicable under the require- 
ments of Section 5.1.1, shall detect the individual 
presence and precise location of each of the separated 
entities to the extent possible within the limits of the 
presence detection segmentation. 

5.1.7 Lost Signal Protection 

For all APM systems, all signals that are critical to 
the functions of ATP shall be continuous or be of such 
a repetitive nature that signal interruption is detected. 
Detection of signal interruption shall result in emer- 
gency braking by ATP in sufficient time so as not to 
compromise any safety aspect of the ATP functional 
design. 

5.1.8 Zero Speed Detection 

On APM systems where the trains are required to 
stop, zero speed detection shall be a required ATP 
function. 

Zero speed shall not be registered until a speed of 
0.30 meters per second (0.95 feet per second) or less is 
attained and braking is commanded. 

5.1.9 Unscheduled Door Opening Protection 
Unscheduled door opening protection shall be a 

required ATP function for all. APM systems. 

If any automatic door or emergency exit door on a 
train unlocks for any reason while the train is in motion 
(above zero speed as defined in Section 5.1 .8), that train 
shall be caused to brake to a full stop. 

For systems that include train/platform separation 
walls and automatic station doors, unscheduled door 
opening protection by ATP shall also apply. If any 
automatic station door is unlocked for any reason, 
trains shall be prohibited from entering or leaving that 
station platform. If any of these doors are unlocked for 
any reason as a train is entering or leaving the station 
platform area, the process of braking the train to a full 
stop shall be immediately initiated. 

In the event of any unscheduled door opening 
(train or station), a local manual reset by authorized 
personnel shall be required prior to the restoration 
of automated train operation. 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



5.1.10 Door Control Protection Interlocks 

Door control protection interlocks shall be provided 
by ATP on all APM systems. 

These interlocks shall ensure that the following 
conditions are satisfied prior to enabling the automatic 
unlocking and opening of the train doors and, if pro- 
vided, the station platform doors: 

1 . The train is "properly aligned" at a station platform 
per the criteria in Section 5.2.2. 

2. Zero speed is detected. 

3. Propulsion power is removed from the motors. 

4. The train is positively constrained against motion. 

For APM systems where trains do not achieve a 
complete stop for boarding and discharging passen- 
gers, the following conditions shall be satisfied for 
automatic unlocking and opening of train doors and 
station platform doors (if provided): 

1 . Speed shall not exceed 0.35 meters per second (1.1 
feet per second). 

2. Acceleration and jerk rates shall be limited to values 
determined to be acceptable by analysis accord- 
ing to the requirements of Section 3.1 .2.1, Hazard 
Analyses. 

3. The entire door opening and door closing sequence 
shall occur within the designated zones as deter- 
mined by an analysis conducted in accordance with 
Section 3.1 .2. 1 , Hazard Analyses. 

5.1.11 Departure Interlocks 

Departure interlocks shall be provided by ATP on 
all APM systems. 

Any train stopped in a station shall not be permit- 
ted to move until all doors (train and station platform, 
if provided) are properly closed and locked. Only then 
shall the constraint against motion be removed and the 
power be applied to the propulsion motors. 

For APM systems where trains do not achieve a 
complete stop for boarding and discharging passen- 
gers, departure interlocks shall be provided to stop 
the train from departing the station if all doors are not 
closed and locked. 

5.1.12 Direction Reversal Interlocks 

Travel direction reversal interlocks shall be provid- 
ed by ATP on all APM systems requiring bidirectional 
operation on any segment of the automated guideway. 

Any reversal of train travel direction shall occur 
only after zero speed has been registered (see Section 
5.1.8). Reversing of train direction shall occur auto- 
matically at stations or terminal zones as required by 
the system configuration for the support of pinched 
loop, intermediate turnback loop, reverse direction 
loop, or shuttle modes of operation. 



Any reversal of a train shall also be possible by 
remote manual command from the Central Control. 

5.1.13 Propulsion and Braking Interlocks 
Propulsion and braking interlocks shall be provided 

by ATP on all APM systems. 

Emergency braking shall be "irrevocable,'' that is, 
once it is initiated, it shall remain activated until the train 
comes to a complete stop. After the train has stopped, 
the emergency braking shall be required to be reset for 
normal operation to resume. For situations where the 
method of reset is not specified by Section 5.0, Automat- 
ic Train Control the method shall be determined by an 
analysis conducted in accordance with Section 3.1.2.1, 
Hazard Analyses, If conditions as determined by ATP are 
not correct for the train to move, the emergency braking 
shall remain applied regardless of any reset signals or 
actions, except that it shall be possible to switch to full 
manual operation, thus disabling the ATP functions of 
that train. If correct ATP conditions exist after irrevoca- 
bility has been removed, the train shall be permitted to 
move, but if a subsequent malfunction occurs, the irrevo- 
cable emergency braking shall be applied as before. 

The emergency braking controls shall be interlocked 
with the propulsion controls such that braking com- 
mands dominate. 

5.1.14 Guideway Switch Interlocks 

Guideway switch interlocks shall be provided by 
ATP for any APM system that operates trains under au- 
tomatic control over a switch/switches installed along 
the guideway. For switching mechanisms on board the 
train, comparable interlocks that meet the intent of this 
section, as determined by analysis in accordance with 
the requirements of Section 3.1.2.1, Hazard Analyses, 
shall be provided. 

ATP shall prevent a train from entering a switch that 
is not properly aligned and locked, and shall prevent a 
switch from becoming unlocked and/or moved once a 
train is committed to traversing it. 

Control circuits shall be arranged so that an aligned 
and locked switch cannot be signaled for a route until 
each portion of the switch is verified to be in the cor- 
rect position. When switch conditions are not correct 
(whether the switch has been activated automatically 
or manually), the control signals normally transmitted 
to approaching trains shall assure that any approaching 
train in automatic mode shall stop before reaching the 
entrance point of the switch. 

Whenever a train is in the protected zone associated 
with a switch or a series of switches, route locking shall 
prevent the automatic or remote manual movement of 
any of the switches in the protected zone and shall pre- 
vent any conflicting train movements from occurring. 



12 



ANSI/ASCE/T&DI 21-05 



Presence detection locking shall be employed 
to prevent a switch from being moved if there is a 
train occupying it regardless of whether the switch 
is being operated under automatic or remote manual 
control, 

Time locking (with approach release of that time 
locking optional) shall be employed in the switching 
circuits so that, if the section of guideway approach- 
ing a switch has been cleared for movement over that 
switch, the switch cannot be moved until a definite 
time has elapsed after the speed limit for the approach- 
ing section has been placed in a zero speed condition 
and the switch is not occupied. The time allowance 
shall be at least 10% greater than the time required for 
the train to traverse the stopping distance as calcu- 
lated in accordance with Section 5.1.2. If the option of 
approach release of the time locking is used, then the 
time can be zero if there is no part of a train occupying 
the approach section. The length of the approach sec- 
tion for the switch shall be greater than the worst-case 
stopping distance computed for that specific guideway 
section. 

ATP shall prevent the automatic or remote manual 
unlocking of a switch after a train has committed to 
traversing it until the train has cleared the switch. 
Protection against inadvertent release of locking due 
to momentary loss of power or train detection shall be 
provided. 

5.2 AUTOMATIC TRAIN OPERATION 
FUNCTIONS 

The ATO shall function to automatically operate 
trains about the system in accordance with prescribed 
operating criteria but within the safety constraints 
imposed by ATP. 

5.2.1 Motion Control 

The starting, stopping, and regulation of the train 
speed as it travels along the guideway shall be con- 
trolled by ATO so that the acceleration, deceleration, 
and jerk rates are within acceptable passenger comfort 
limits and the speed is maintained below the overspeed 
limits imposed by ATP. 

5.2.2 Programmed Station Stop 
Programmed station stops shall be made within 

acceptable passenger comfort limits. When boarding 
and discharging passengers, the train shall provide at 
all doors at least an 82 cm (32.5 inches) clear open- 
ing within the designated boarding zone. This open- 
ing shall allow egress only onto the platform. 

If the train and station doors are misaligned by more 
than the distance permitted in the preceding paragraph, 
the doors shall not open automatically. An alarm shall 
be sent to Central Control. 



5.2.3 Door and Dwell-Time Control 

Train doors shall be automatically controlled by 
ATO during passenger boarding and discharging. If 
automatic station doors are provided, they shall be 
controlled as a set with matching train doors. Train 
and matching station doors, if provided, shall open and 
close together. 

It shall be possible to manually disable the opera- 
tion of any door set (on the train or at the station) 
without affecting the automatic operation of other 
unaffected sets. When automatic station doors are 
provided and a door set (train/station) is disabled, then 
the matching set shall also be disabled with respect to 
automatic operations but without the need for manual 
intervention. 

If any doors fail to open or fail to close within 10 
seconds of being commanded to do so, an alarm shall 
be sent to Central Control. 

The amount of time the train remains in the station 
with doors open shall be established by the designer 
and automatically controlled by ATS as a function of 
fully automated operation. Once door open time has 
expired and any ''hold door open" commands initi- 
ated by ATS or the Central Control operator have been 
removed, all doors shall be commanded to close. 

When a train under manual control is properly 
berthed in a station and the train operator commands 
the train doors to open or close, the corresponding sta- 
tion doors, if provided, shall also open or close. 

5.3 AUTOMATIC TRAIN SUPERVISION 
FUNCTIONS 

Automatic Train Supervision shall monitor and 
manage the overall operation of the system. ATS shall 
provide the interface between the system and the 
Central Control operator. Through audio and visual 
displays, information shall be presented describing the 
status of the system on a real-time basis. This informa- 
tion shall allow the Central Control operator to assess 
conditions throughout the system and to take appropri- 
ate actions. The Central Control operator shall be able 
to issue commands to initiate and terminate system 
operations, override selected automatic commands and 
operations, and perform other system management 
functions. 

For APM systems where there is no operator physi- 
cally located in Central Control, alarms and malfunc- 
tion information must be transmitted to a responsible 
individual authorized to respond to the situation in a 
timely manner. 

5.3.1 Constraints on Automatic Train Supervision 

Should ATS become completely inoperative for any 
reason, ATP and ATO shall remain operable unless a 



13 



AUTOMATED PEOPLE MOVER STANDARDS— PART 



system shutdown is commanded by the Central Control 
operator. Emergency controls on the Central Control 
console shall, independent of the ATS equipment, pro- 
vide at least the following system emergency shutdown 
functions: 

1. All trains stop 

2. All propulsion power shut off 

5.3.2 Status and Performance Monitoring 

System status and performance information shall 
be presented to the Central Control operator by way 
of functionally separate displays, the System Opera- 
tions Display and the Power Schematic Display. 

5 J. 2 J System Operations Display 

The System Operations Display (SOD) shall provide 
a visual representation of real-time operating conditions 
throughout the system. The display design shall: 

1. Be of sufficient size and/or quantity and display 
resolution to be viewed with ease from the normal 
seating area at the Central Control operator con- 
soles. 

2. Show approximate geographical representations of 
the guideway and the locations of relevant physical 
features such as passenger stations, switches, and/or 
maintenance and storage facilities. 

3. Dynamically depict any of the following system 
operating conditions that are pertinent to the system 
configuration: 

a. The location and identification of all trains in 
all parts of the system designed for automatic 
operation 

b. The direction of travel of all active trains 

c. The number of cars comprising each train (if 
train consist is variable) 

d. The train identification number used to 
interact with the train (if train identification is not 
obvious from the system configuration) 

e. The status of any switches in the system 

f . The operating mode and status of selected sys- 
tem equipment 

g. The status of each station including the current 
active dwell for each station 

4. Incorporate such other visual aids as may be neces- 
sary to permit the Central Control operator(s) to 
manage the system efficiently. 

53.2.2 Power Schematic Display 

The Power Schematic Display (PSD) shall provide 
a visual indication of the power distribution system 
status throughout the system. The PSD shall be of suf- 
ficient size and/or quantity and display resolution to be 



viewed with ease from the normal seating area at the 
Central Control operator console(s). 

The PSD shall clearly display the following condi- 
tions as a minimum: 

1 . The presence or absence of electrical power in each 
propulsion power circuit, which may be individu- 
ally energized or de-energized. 

2. The presence or absence of any power distributed 
along the guideway by guideway segment for each 
power segment that may be individually energized 
or de-energized. 

3. The status of all circuit breakers and/or switches in 
the power supply system. Any tripped condition 
shall be alarmed. 

4. The presence or absence of backup power. 

5. The presence of any alarm condition. 

Indication of power status shall be by both voltage 
monitoring and device position indication. PSD indica- 
tion and control functions shall not be affected by any 
single point failure. 

5.3.3 Performance Control and Override 

Management and operation of the system shall be 
accomplished by the control and override functions. 
There shall be both automatically controlled and 
manually initiated control and override functions as 
described in this section. 

5.3.3.1 Automatic Control Functions 

To the extent warranted, the ATS system shall per- 
form the control and coordination functions necessary 
to achieve fully supervised automatic operation of the 
system. 

5.3.3.1.1 Mode Management: The ATS shall manage all 
specified modes of operation. Available modes shall de- 
pend upon system technology, guideway configuration, 
operating plan, and failure mode recovery plan. 

5.3.3.1.2 Train Tracking: The ATS shall systemati- 
cally track each train around the system to the extent 
warranted by the system configuration and in a manner 
that is consistent with the requirements for manage- 
ment of the specified modes of operation. 

5.3.3.1.3 Headway Management: Consistent with the 
selected mode of operation and the specified degree of 
interactive train regulation, the ATS shall act to main- 
tain the required time (as measured at a fixed point on 
the guideway) and/or distance spacing between trains 
in automatic operation on the system. 

5.3.3.1.4 Train Routing: The ATS shall automati- 
cally accomplish all routing functions required by the 



14 



ANSI/ASCE/T&DI 2.1-05 



selected mode of operation. This shall include initiat- 
ing route, switch position, and travel direction reversal 
requests, as required. 

533.2 Manual Control and Override Functions 

The capabilities and functions described in this 
section shall be incorporated in the Central Control 
console. Controls and displays associated with ATC 
shall be integrated with the controls and displays of the 
communications (see Section 6.0, Communications) 
and electrical (see Section 5.3.2.2, Power Schematic 
Display) subsystems so as to facilitate the efficient/ef- 
fective supervision of all subsystems by one operator 
at the console. 

Manual controls shall be provided that enable the 
Central Control operator to perform the following 
functions: 

1. Train Dispatching: The Central Control operator 
shall be able to dispatch trains into service from 
any designated off-line launch point. 

2. Train Routing: Depending upon the system con- 
figuration, the ATS shall be designed so that each 
train can be assigned to a specific operating mode, 
lane, or route, via an instruction from the Central 
Control operator. 

3. Initiation of Service: The Central Control operator 
shall be able to initiate system service. 

4. Termination of Service: The Central Control op- 
erator shall be able to terminate system service. 

5. Modify Train Operations: The Central Control 
operator shall be able to issue commands that 
modify normal train operation. 

6. Remove Trains: For systems that provide off-line 
storage, the Central Control operator shall be able 
to direct a train to proceed out of service. 

7. Initiate Failure Mode Operations: The Central 
Control operator shall be able to convert the 
system from its normal operating mode to any 
available alternative operating mode for failure 
management purposes. 

8. Hold Trains: The Central Control operator shall 
be able to command trains to hold in the stations. 

9. Command Switches: When switches are provided, 
the Central Control operator shall be able to indi- 
vidually command switches to move. 

1 0. Stop All Trains: The Central Control operator with 
one command shall be able to stop all trains on 
the guideway. 

1 1 . Command Power Off/On: The Central Control 
operator shall be able to command propulsion 
power off/on to the entire system or to individual 
power circuits, depending upon the segmentation 
provided. 



12. Acknowledge and Process Alarms: The Cen- 
tral Control operator shall be able to receive 
from several subsystems, acknowledge, 
store, and recall alarm message displays and 
acknowledge accompanying audible alarms. 

Except for a single-event command, once a com- 
mand is imposed by the Central Control operator and 
accepted by ATS, the action shall remain operative 
until subsequently removed by the operator. 

5333 Alarms and Malfunction Reporting 

Major system components shall be automatically 
monitored and alarms shall be annunciated for mal- 
functions and failures thereof. Also, system-related 
facilities shall be monitored and alarms annunciated 
for lire/life safety problems and/or security intru- 
sions. The Central Control console shall incorporate 
both an incident (message) display and audible 
alarms for the benefit of the Central Control opera- 
tor. Within two seconds of detection, the occurrence 
of an incident or condition shall be reported on a 
display, indicating the time of the incident, the nature 
and classification of the incident or condition, the 
identification of the vehicle and train, and/or the 
specific guideway or station location involved. Each 
alarm shall be indexed and time-tagged as to when 
the fault was detected. Alarms shall be stored and 
have the capability of being recalled/redisplayed 
by an index number or by the hardware type with 
which it is associated (e.g., train, substation, pas- 
senger station, switch). Acknowledgement of the 
alarm by the Central Control operator shall cause the 
audible alarm to cease; however, the associated alarm 
indication shall persist until the condition is cleared. 
All alarm reports and clearing shall be recorded in 
memory and printed on a line printer. 

Data communications between Central Control and 
trains shall be maintained and confirmed. Failure of 
any train to respond shall be alarmed and annunciated 
at Central Control. 

5.3.3.3.1 System Alarms: System operation malfunc- 
tions, alarms, and reporting shall be primarily for 
security, safety, and unscheduled stoppage problems. 

As a minimum, system operations malfunctions 
shall be reported in one of two priority classifications, 
as described below. The level of classification and 
reporting of faults shall be sufficiently detailed to allow 
operating and maintenance personnel to make rational 
decisions in reacting to the reports, consistent with the 
functions required of them in the operation and mainte- 
nance plans, procedures, and manuals. 



15 



AUTOMATED PEOPLE MOVER STANDARDS—PART 1 



Priority I malfunctions are those that pose an im- 
mediate threat to passenger safety and/or the threat 
of damage to system equipment. 

Priority II malfunctions are those that do not pose an 
immediate threat but could cause a potential threat to 
passengers or equipment if not corrected quickly. 

5.3.3.3.2 Facility Fire and Intrusion Alarms: Facility 
fire/smoke and intrusion alarms, if provided, shall be 
annunciated separately and redundantly (audibly and 
visually) on the Central Control console. The location 
of the alarm point shall be indicated. 

5.3.3.4 Data Recording and Reporting 

The ATS subsystem shall include the recording of 
selected data transactions between Central Control 
and other portions of the system. Such data shall be 
recorded in a format that includes the date and exact 
time of each data transmission. Data shall be recorded 
and stored on appropriate media in a format suitable 
for both a permanent file and random access retrieval 
and for use with system data processing software to 
produce reports, if provided. 

If specified, an appropriate subset of this recorded 
data shall be able to be printed in real time on a printer 
at Central Control. This printout shall constitute the 
Daily Operations Log. 

5.4 MANUAL OPERATION LIMITATIONS 

These APM Standards are intended for fully auto- 
matic operation and do not apply to extended passen- 
ger service in manual mode. Manual mode operation 
may be used for testing, recovery, maintenance, and 
system failures/failure management, or other abnormal 
conditions. The Hazard Resolution Process of Section 
3.1.2 shall address the hazards introduced by manual 
operation. 

For limited manual operation, the design shall en- 
able the operator(s) to observe guideway conditions, 
communicate with Central Control and passengers, 
observe vehicle status indications, and control vehicle 
propulsion, braking, and doors. When not in use, the 
controls and status indicators shall be protected from 
access by passengers. 



6.0 AUDIO AND VISUAL COMMUNICATIONS 

All audio and visual communications equipment 
shall operate independently of guideway power and 
shall function fully under the ambient conditions to 
which it may be exposed. All audio and visual commu- 
nications equipment required by this standard shall be 
powered by uninterruptible power for a time period as 



determined by an analysis in accordance with Section 
3 . 1 .2. 1 , Hazard Analyses. 

6.1 AUDIO COMMUNICATION 

Facilities and equipment shall be provided to permit 
voice communications between the Central Control 
Operator and (1) passengers, and (2) operations and 
maintenance personnel located throughout the System. 

All audio communication systems and pub- 
lic address systems required herein shall meet the 
requirements of Section 6.1.6. 

6.1.1 Station Public Address 

A station public address system shall enable live 
announcements to be made from Central Control to all 
public areas of all station platforms. 

Live messages shall override any prerecorded mes- 
sages, if provided. All speakers in a given station zone 
shall deliver announcements simultaneously when that 
station or zone is selected. The public address system 
zoning shall provide full coverage to all public areas of 
each station. 

6.1.2 Emergency Station and Wayside 
Communications 

There shall be two-way emergency audio commu- 
nications linking Central Control with all passenger 
stations and any Blue Light Stations (as specified by 
Section 11.4.1, Standard for Fixed Guideway Tran- 
sit and Passenger Rail Systems, NFPA 1 30-2003). 
Each Emergency Communication Device (ECD) shall 
automatically call Central Control when activated. 
A display at Central Control shall identify the com- 
municating ECD and indicate whether there are any 
additional activated ECDs. 

All ECD equipment shall be of heavy duty, van- 
dal-resistant design, including a tamper- and weather- 
resistant enclosure. These emergency audio communica- 
tions shall be independent of any other communication 
system. The person operating the ECD shall receive an 
audible indication that the unit is calling. Instinct ions for 
use shall be provided in vandal-resistant signs integral 
with or adjacent to the ECDs. 

6.1.3 Train Voice Communications and 

Public Address 

A full-duplex communications system shall be 
provided to permit two-way voice communications 
between the Central Control Operator and passengers 
or personnel within each passenger compartment of 
each train. Full coverage of all trains throughout the 
System shall be provided. Activation of two-way voice 
communications between Central Control and the 
trains shall be possible only from Central Control. Pas- 
senger-initiated communications requests from a train, 
including the passenger compartment identification 



16 



ANSI/ASCE/T&DI 21-05 



number, shall automatically be displayed at Central 
Control for the Centra] Control Operator to activate the 
communications link. The display shall also show any 
queue of such communication requests. The Central 
Control Operator shall be able to activate this link 
upon receiving an indication of a passenger- initiated 
communications request or at any other time to receive 
communications. A passenger-initiated communica- 
tions request shall include an audio and visual on- 
board indication that the call has been requested. 

A train public address function shall be provided 
for the Central Control Operator in two modes: (1) to 
make audible announcements in all passenger com- 
partments of any one train, and (2) to make audible 
announcements in all passenger compartments of all 
trains in the System. Live messages shall override 
any prerecorded messages, if provided. Speaker fire 
resistance shall meet the requirements of Commercial 
Audio Equipment, UL 813-1993. Full coverage of all 
trains throughout the System shall be provided. For 
trains that can be operated in manual mode, a means 
shall be provided to enable the train operator to make 
announcements throughout the train. 

6.1.4 Operations and Maintenance Personnel 
Communications 

The APM System shall include an internal tele- 
phone/intercom system connecting Central Control, 
all administrative offices and maintenance areas, and 
selected storage and equipment rooms. Telephones/ 
intercoms not otherwise protected shall be of heavy- 
duty, vandal-resistant design, including a tamper- and 
weather-resistant enclosure. 

An O&M radio system shall be provided for com- 
munications between the Central Control Operator 
and O&M personnel. Each O&M person on duty not 
having direct access to the internal telephone/intercom 
system shall have a portable radio at all times. 

6.1.5 Recording of Audio Transmissions 

An audio recording device shall be provided to re- 
cord all communications over train voice communica- 
tions, ECDs, and public address systems with the Cen- 
tral Control Operator. This device shall be capable of 
individually recording at least 24 hours of continuous 
audio for each audio communication system described 
in Section 6.1.1 through Section 6.1.3 with indication 
of date and time. Recording media shall be provided so 
that each day's recording can be stored. 

6.1.6 Intelligibility of Audio Communications 

The required audio communications systems shall 
meet the following: 



1. Station public address systems, emergency station 
and wayside communications systems, and the in- 
ternal O&M telephone/intercom system shall meet 
the intelligibility requirements of NFPA 72-2002. 
In meeting the intelligibility requirements, measure- 
ment conditions shall represent the entire passenger 
space of the station or the position of the telephone/ 
intercom and provide the average result of all re- 
flected signals and reverberations, and all auxiliary 
systems shall be in normal operation, such that the 
ambient noise will be at typical maximum levels. 
The tests of telephones/intercoms shall be repeated 
for a representative number of locations throughout 
the System. 

2. All wireless voice communications between the 
wayside and the trains, including Central Control 
shall meet DAQ 3 of Table 1 . Annex- A of TIA/EIA 
Telecommunications Systems Bulletin, Wireless 
communications systems-performance in noise 
and bite rfe rence-Hmited situations-recommended 
methods for technology -independent modeling, 
simulation, and verification, TSB-88, January 2002, 
for 97% of the train way. In areas of the train way 
where DAQ 3 is met, the intelligibility shall meet 
the intelligibility requirements of NFPA 72-2002. 
The vehicle interior noise shall be at least at the 
maximum interior level as measured in accordance 
with Part 2, Section 7.7.4. This test shall be repeated 
for a representative number of locations throughout 
the System. 

3. All voice communications exclusively within a train 
shall meet the intelligibility requirements of NFPA 
72-2002. The vehicle interior noise shall be at least 
at the maximum interior level as measured in ac- 
cordance with Part 2, Section 7.7.4. 

4. The O&M radio system shall provide signal cover- 
age greater than or equal to DAQ 3, as referenced in 
(2) above, for 97% area coverage reliability within 
the System where O&M personnel may work. 

6.2 VIDEO SURVEILLANCE 

A closed-circuit television (CCTV) subsystem shall 
be provided and installed to permit Central Control to 
monitor passenger activities on all station platforms in 
the System, particularly the boarding areas and along 
the entire edge of any open platforms. Video surveil- 
lance is not required for attended station platforms. 

6.2.1 Central Control Equipment 

Central Control shall be equipped with monitors for 
displaying camera outputs, organized in a logical order 
with identifications displayed on each screen to orient 
the Central Control Operator and facilitate identifica- 
tion of the imase location. 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



Closed-circuit televisors monitors shall provide a 
clear picture in the ambient light level of the Central 
Control room. 

6.2.2 Passenger Station Equipment 

Cameras shall have a "usable picture" with scene 
illumination from 0.3 Lux (0.03 foot-candles) up to 
bright sunlight, using automatic light compensation. 
Cameras shall be tamper-proof and vandal-resistant. 
Cameras shall automatically adjust to the environmen- 
tal and the ambient light conditions of each station 
throughout the operating day. 

Camera position for platform viewing, particularly 
the boarding areas and along the entire edge of any 
open platforms, shall be fixed and shall not be remotely 
controlled. Camera mounts and any housings shall be 
tamper- proof and vandal-resistant for all applications 
and weather-resistant for outdoor applications. 

6.2.3 Recording of Video Transmissions 

A system shall be provided to record the image 
of each camera in the system, but not necessarily all 
cameras simultaneously, to include identification of the 
camera, time, and date, 

6.3 PASSENGER INFORMATION DEVICES 

The following audio announcements and dynamic 
signs are required for APM systems. 

6.3.1 Vehicle 

Each passenger compartment shall have automatic 
on-board audible announcements that signal each 
station as it is approached to inform passengers of 
the impending stop. For APM systems having trains 



operating over more than one route from the same 
platform, audio announcements shall indicate the name 
of the station. 

For APM systems having trains operating over more 
than one route from the same platform, dynamic signs 
shall be provided for each passenger compartment that 
indicate train route and/or destination and the name 
of the station at. which the train is approaching or has 
stopped. These dynamic signs shall be positioned for 
maximum visibility by passengers. 

6.3.2 Stations 

Each station platform shall be provided with 
automatic audible and visual warnings that signal the 
arrival and departure of trains. The arrival warning 
shall be made before the train enters the station. The 
departure warning indicating that the doors are about 
to be closed shall be communicated to passengers both 
in the trains and on the platform. APM systems where 
trains do not achieve a complete stop for boarding and 
discharging passengers shall provide warnings that 
meet an equivalent facilitation in accordance with Sec- 
tion 3.1.2.1. Hazard Analyses, APM systems having 
trains operating over more than one route from the 
same platform shall also audibly announce train route 
and/or destination. 

For APM systems having trains operating over 
more than one route from the same platform, dynamic 
station signs shall be provided on each station platform 
to inform passengers of train route and/or destination. 
The vehicle dynamic sign may satisfy this requirement 
provided that the message is also posted on the exterior 
of the vehicle and can be read by passengers on the 
station platform. 



18 



ANNEX A 
System Safety Program Requirements 

THIS ANNEX IS A MANDATORY PART OF THE STANDARD 

(As indicated in Section 3.0, Safety Requirements, equivalent techniques may be used in place of the techniques 
outlined in this annex.) 



A.l SYSTEM SAFETY PROGRAM PLAN 
A. 1.1 Purpose 

The System Safety Program Plan (SSPP) shall describe 
in detail tasks and activities of system safety management 
and system safety engineering required to identify, evalu- 
ate, and eliminate/control hazards, or reduce the associated 
risk to a level acceptable to the authority having jurisdic- 
tion throughout the system life cycle. 

A. 1.2 Description 

The SSPP shall be developed to provide a basis of 
understanding as to how the system safety program 
will be accomplished to meet safety requirements. 
The approved plan shall, on an :item-by-item basis, 
account for all required tasks and responsibilities. 
The SSPP shall include the following: 

A J. 2.1 Program Scope and Objectives 

Each SSPP shall describe, as a minimum, the four ele- 
ments of an effective system safety program: a planned 
approach for task accomplishment, qualified people to 
accomplish tasks, authority to implement tasks through 
all levels of management, and appropriate commitment 
of resources (both staffing and funding) to assure tasks 
are completed. The SSPP shall define a program to sat- 
isfy the system safety requirements. This section shall: 

1 . Describe the scope of the overall program and the 
related system safety program. 

2. List the tasks and activities of system safety manage- 
ment and engineering. Describe the interrelationships 
between system safety and other functional elements 
of the program. List the other program requirements 
and tasks applicable to system safety. Identify where 
they are specified or described. 

3. Account for all required safety tasks and responsi- 
bilities. A matrix shall be provided to correlate the 
requirements to the location in the SSPP where the 
requirement is addressed. 

A. 1.2.2 System Safety Organization 

The SSPP shall describe: 

1 . The system safety organization or function within 
the organization of the total program, using charts 
to show the organizational and functional rela- 
tionships, and lines of communication. The orga- 
nizational relationship between other functional 
elements having responsibility for tasks with system 



safety impacts and the system safety manage- 
ment and engineering organization shall be shown. 
Review and approval authority of applicable tasks 
by system safety shall be described. 

2. The responsibility and authority of system safety 
personnel, other organizational elements involved in 
the system safety effort, and system safety groups. 
Describe the methods by which safety personnel may 
raise issues of concern directly to the program man- 
ager or the program manager's supervisor within the 
corporation. Identify the organizational unit respon- 
sible for executing each task. Identify the authority in 
regard to resolution of all identified hazards. 

3. The staffing of the system safety organization for the 
duration of the contract to include manpower loading, 
control of resources, and a summary of the qualifica- 
tions of key system safety personnel assigned to the 
effort, including those who possess coordination/ 
approval authority for prepared documentation. 

4. The procedures for the integration and coordination of 
the system safety efforts, including assignment of the 
system safety requirements to action organizations, 
coordination of system safety programs, integration 
of hazard analyses, program and design reviews, 
program status reporting, and system safety groups. 

5. The process through which management deci- 
sions will be made, including timely notification 
of unacceptable risks, necessary action, incidents 
or malfunctions, waivers to safety requirements, 
program deviations, and so on. 

6. Details of how resolution and action relative to system 
safety will be effected at the program management 
level possessing resolution authority. 

A. 1.2 3 System Safety Program Milestones 
The SSPP shall: 

1. Define system safety program milestones. Relate 
these to major program milestones, program ele- 
ment responsibility, and required inputs and outputs. 

2. Provide a program schedule of safety tasks includ- 
ing start and completion dates, reports, and reviews. 

3. Identify subsystem, component, and software 
safety activities as well as integrated system-level 
activities (i.e., design analyses, tests, and demon- 
strations) applicable to the system safety program 
but specified in other engineering studies and devel- 
opment efforts to preclude duplication. 



19 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



4. Provide the estimated manpower loading required to 
complete each task. 

A. 1.2.4 General System Safety Requirements 
and Criteria 
The SSPP shall: 

1 . Describe general engineering requirements and design 
criteria for safety. Describe safety requirements for 
support equipment and operational safety require- 
ments for all appropriate phases of the life cycle up to, 
and including, disposal. List the safety standards and 
system specifications containing safety requirements 
that shall be complied with. Include titles, dates, and 
where applicable, paragraph numbers. 

2. Describe the risk assessment procedures. The hazard 
severity categories, hazard probability levels, and the 
system safety precedence that shall be followed to 
satisfy the safety requirements of the program. State 
any qualitative or quantitative measures of safety to 
be used for risk assessment, including a description 
of the acceptable/unacceptable risk levels. Include 
system safety definitions that modify, deviate from, 
or are in addition to those in this standard. 

3. Describe closed-loop procedures for taking action to 
resolve identified unacceptable risk, including those 
involving non.development.al items. 

A. 1.2. 5 Hazard A. nalysis 

The SSPP shall describe: 

1 . The analysis techniques and formats to be used in 
qualitative or quantitative analysis to identify haz- 
ards, their causes and effects, hazard elimination, or 
risk reduction requirements and how those require- 
ments are met. 

2. The depth within the system to which each technique 
is used, including hazard identification associated 
with the system, subsystem, components, software, 
hazardous materials, personnel, ground support 
equipment, non developmental items, facilities, and 
their interrelationship in the logistic support, training, 
maintenance, operational, and disposal (including 
render safe and emergency disposal) environments. 

3. The integration of hazard analyses performed by 
others with overall system hazard analyses. 

4. Efforts to identify and control hazards associated 
with materials used during the system's life cycle. 

A. 1.2.6 System Safety Data 

The SSPP shall: 

1. Describe the approach for collecting and processing 
pertinent historical hazard, mishap, and safety les- 
sons learned, and data. 



2. Identify deliverable data by title and number, and 
means of delivery (e.g., hard copy, electronically). 

3. Identify nondeliverable system safety data and 
describe the procedures for accessibility by the 
authority having jurisdiction and retention of data 
of historical value. 

A. 1.2.7 Safety Verification 
The SSPP shall describe: 

1. The verification (test, analysis, inspection, etc.) 
requirements for making sure that safety is 
adequately demonstrated. Identify any certification 
requirements for software, safety devices, or other 
special safety features (e.g., render safe and emer- 
gency disposal procedures). 

2. Procedures for making sure safety -related verifica- 
tion information is transmitted to the authority hav- 
ing jurisdiction for review and analysis. 

3. Procedure for ensuring the safe conduct of all tests. 

A. 1.2.8 Audit Program 

The SSPP shall describe the techniques and proce- 
dures to be employed to make sure the objectives and 
requirements of the system safety program are being 
accomplished. 

A.l.2.9 Training 

The SSPP shall describe the safety training for 
engineering, technician, operating, and maintenance 
personnel. 

A J. 2.10 Incident Reporting 

The SSPP shall describe the mishap/incident alerting/ 
notification, investigation, and reporting process includ- 
ing notification of the authority having jurisdiction. 

A. 1.2. 11 System Safety Interfaces 
The SSPP shall identify, in detail: 

1 . The interface between system safety, systems 
engineering, and all other support disciplines such as: 
maintainability, quality control, reliability, software 
development, human factors engineering, medical 
support (health hazard assessments), and any others. 

2. The interface between system safety and all system 
integration and test disciplines. 

A.2 PRELIMINARY HAZARD ANALYSIS 
A.2.1 Purpose 

The Preliminary Hazard Analysis (PHA) shall iden- 
tify safety critical areas, provide an initial assessment 
of hazards, and identify requisite hazard controls and 
follow-on actions. 



20 



ANSI/ASCE/T&DI 21-05 



A.2.2 Description 

A preliminary hazard analysis shall be performed 
and documented to obtain an initial risk assessment of 
a concept or system. Based on the best available data, 
including mishap data (if assessable) from similar 
systems and other lessons learned, hazards associated 
with the proposed design or function shall be evaluated 
for hazard severity, hazard probability, and operational 
constraint. Safety provisions and alternatives needed 
to eliminate hazards or reduce their associated risk to a 
level acceptable to the authority having jurisdiction shall 
be included. The PHA shall consider the following for 
identification and evaluation of hazards as a minimum: 

1. Hazardous components (e.g., fuels, propellants, lasers, 
toxic substances, hazardous construction materials, 
pressure systems, and other energy sources). 

2. Safety- related interface considerations among vari- 
ous elements of the system (e.g., material compat- 
ibilities, electromagnetic interference, inadvertent 
activation, fire/explosive initiation and propagation, 
and hardware and software controls). This shall 
include consideration of the potential contribu- 
tion by software (including software developed by 
other sources) to subsystem/system mishaps. Safety 
design criteria to control safety critical software 
commands and responses (e.g., inadvertent com- 
mand, failure to command, untimely command 

or responses, inappropriate magnitude, or other 
designated undesired events) shall be identified and 
appropriate action taken to incorporate them in the 
software (and related hardware) specifications. 

3. Environmental constraints including the operating 
environments (e.g., drop, shock, vibration, extreme 
temperatures, noise, exposure to toxic substances, 
health hazards, fire, electrostatic discharge, light- 
ning, electromagnetic environmental effects). 

4. Operating, test, maintenance, built-in-tests, diagnos- 
tics, and emergency procedures (e.g., human factors 
engineering; human error analysis of operator func- 
tions, tasks, and requirements; effect of factors such 
as equipment layout, lighting requirements, poten- 
tial exposures to toxic materials; effects of noise or 
radiation on human performance). Those test unique 
hazards that will be a direct result of the test and 
evaluation of the article or vehicle. 

5. Facilities, real property installed equipment, support 
equipment (e.g., provisions for storage, assembly, 
checkout, proof/testing of hazardous systems/ 
assemblies that may involve toxic, flammable, 
explosive, corrosive, or cryogenic materials/wastes; 
radiation or noise emitters; electrical power sources) 
and training (e.g., training and certification pertain- 
ing to safety operations and maintenance). 



6. Safety-related equipment, safeguards, and pos- 
sible alternate approaches (e.g., interlocks; system 
redundancy; fail-safe design considerations using 
hardware or software controls; subsystem protec- 
tion: fire detection and suppression systems; personal 
protective equipment; heating, ventilation, and air- 
conditioning; and noise or radiation barriers). 

7. Malfunctions to the system, subsystems, or soft- 
ware. Each malfunction shall be specified, the caus- 
ing and resulting sequence of events determined, 
the degree of hazard determined, and appropriate 
specification and/or design changes developed. 

A3 SUBSYSTEM HAZARD ANALYSIS 
A.3.1 Purpose 

The Subsystem Hazard Analysis (SSHA) shall: 

1 . Verify subsystem compliance with safety require- 
ments contained in subsystem specifications and 
other applicable documents. 

2. Identify previously unidentified hazards associated 
with the design of subsystems including compo- 
nent failure modes, critical human error inputs, 
and hazards resulting from functional relationships 
between components and equipment comprising 
each subsystem. 

3. Recommend actions necessary to eliminate iden- 
tified hazards or control their associated risk to 
acceptable levels. 

A.3.2 Description 

A subsystem hazard analysis shall be performed and 
documented to identify all components and equipment 
that could result in a hazard or whose design does not 
satisfy contractual safety requirements. Areas to consider 
are performance, performance degradation, functional 
failures, timing errors, design errors or defects, or inad- 
vertent functioning. The human shall be considered a 
component within a subsystem, receiving both inputs and 
initiating outputs, during the conduct of this analysis. 

The analysis shall include a determination: 

1. Of the modes of failure, including reasonable 
human errors as well as single-point and 
common-mode failures, and the effects on safety 
when failures occur in subsystem components. 

2. Of potential contribution of hardware and software 
(including that which is developed by other sources) 
events, faults, and occurrences (such as improper 
timing) on the safety of the subsystem. 

3. That the safety design criteria in the hardware, 
software, and facilities specification(s) have been 
satisfied. 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



4. That the method of implementation of hardware, 
software, and facilities design requirements and 
corrective actions has not impaired or decreased the 
safety of the subsystem nor has it introduced any 
new hazards or risks. 

5. Of the implementation of safety design require- 
ments from top level specifications to detailed 
design specifications for the subsystem. The imple- 
mentation of safety design requirements developed 
as part of the PHA shall be analyzed to ensure that 
it satisfies the intent of the requirements. 

6. Of test plan and procedure recommendations to 
integrated safety testing into the hardware and soft- 
ware test programs. 

7. That system-level hazards attributed to the subsys- 
tem are analyzed and that adequate control of the 
potential hazard is implemented in the design. 

When software to be used in conjunction with the 
subsystem is being developed, the individual(s) perform- 
ing the SSHA shall monitor, obtain, and use the output of 
each phase of the formal software development process 
in evaluating the software contribution to the SSHA. 

The SSHA shall be updated as a result of any 
system design changes, including software design 
changes, that affect system safety. 

A.4 SYSTEM HAZARD ANALYSIS 
A Al Purpose 

The System Hazard Analysis (SHA) shall: 

1 . Verify system compliance with safety requirements 
contained in system specifications and other appli- 
cable documents. 

2. Identify previously unidentified hazards associated 
with the subsystem interfaces and system functional 
faults. 

3. Assess the risk associated with the total system 
design, including software, and specifically of the 
subsystem interfaces. 

4. Recommend actions necessary to eliminate identi- 
fied hazards and/or control their associated risk to 
acceptable levels. 

A. 4.2 Description 

A system hazard analysis shall be performed and 
documented to identify hazards and assess the risk of 
the total system design, including software, and spe- 
cifically of the subsystem interfaces. 

This analysis shall include a review of subsystem 
interrelationships for: 

1 . Compliance with specified safety design criteria. 

2. Possible independent, dependent, and simultane- 
ous hazardous events including systems failures, 



failures of safety devices, common cause failures 
and events, and system interactions that could cre- 
ate a hazard or result in an increase in mishap risk. 

3. Degradation in the safety of a subsystem or the total 
system from normal operation of another subsystem. 

4. Design changes that affect subsystems. 

5. Effects of reasonable human errors. 

6. Determination: 

a. Of potential contribution of hardware and soft- 
ware (including that which is developed by other 
sources, or Commercial Off-The-Shelf hardware 
or software) events, faults, and occurrences (such 
as improper timing) on safety of the system. 

b. That the safety design criteria in the hardware, 
software, and facilities specification(s) have been 
satisfied. 

c. That the method of implementation of the 
hardware, software, and facilities design require- 
ments and corrective actions has not impaired 

or degraded the safety of the system nor has it 
introduced any new hazards. 

The SHA may be combined with and/or performed 
using similar techniques to those used for the SSHA. 

When software to be used in conjunction with the 
system is being developed, the individual(s) perform- 
ing the SHA shall monitor, obtain, and use the output of 
each phase of the formal software development process 
in evaluating the software contribution to the SHA. 

The SHA shall be updated as a result of any system 
design changes, including software design changes, 
that affect system safety. 

A.5 OPERATING AND SUPPORT HAZARD 

ANALYSIS 

A.5.1 Purpose 

The Operating and Support Hazard Analysis 
(O&SHA) shall evaluate activities for hazards or risks 
introduced into the system by operational and support 
procedures and evaluate adequacy of operational and 
support procedures used to eliminate, control, or abate 
identified hazards or risks. 

A.5.2 Description 

An O&SHA shall be performed to examine proce- 
durally controlled activities. The O&SHA identifies and 
evaluates hazards resulting from the implementation of 
operations or tasks performed by persons, considering: 

1 . The planned system configuration/state at each 
phase of activity. 

2. The facility interfaces. 

3. The planned environments (or ranges thereof). 

4. The supporting tools or other equipment, includ- 
ing software-controlled automatic test equipment, 



22 



ANSI/ASCE/T&DI 21-05 



specified for use; operational/task sequence; concur- 
rent task effects; and limitations. 
5. The potential for unplanned events including haz- 
ards introduced by human errors. 

The human shall be considered an element of the 
total system, receiving both inputs and initiating outputs 
during the conduct of this analysis. The O&SHA must 
identify the safety requirements (or alternatives) needed 
to eliminate or control identified hazards, or to reduce 
the associated risk to a level that is acceptable under 
either regulatory or contractually specified criteria. 

The analysis shall identify: 

1 . Activities that occur under hazardous conditions, 
their time periods, and the actions required to mini- 
mize risk during these activities/time periods. 

2. Changes needed in functional or design require- 
ments for system hardware/software, facilities, 
tooling, or support/test equipment to eliminate or 
control hazards or reduce associated risks. 

3. Requirements for safety devices and equipment, in- 
cluding personnel safety and life support equipment. 



4. Warnings, cautions, and special emergency proce- 
dures (e.g., egress, rescue, escape), including those 
necessitated by failure of a computer software- 
controlled operation to produce the expected and 
required safe result or indication. 

5. Requirements for packaging, handling, storage, 
transportation, maintenance, and disposal of hazard- 
ous materials. 

6. Requirements for safety training and personnel 
certification. 

7. Effects of nondevelopmental hardware and software 
across the interface with other system components 
or subsystems. 

8. Potentially hazardous system states under operator 
control. 

The O&SHA shall document system safety assess- 
ment of procedures involved in: system production, 
deployment, installation, assembly, test, operation, 
maintenance, servicing, transportation, storage, modifi- 
cation, demilitarization, and disposal. 

The O&SHA shall be updated as a result of any 
system design or operational changes. 



ANNEX B 



Bibliography 



THIS ANNEX IS INFORMATIVE AND NOT A MANDATORY PART OF THE STANDARD 

Refer to the following for examples and guidance in the conduct of associated activities of the system safety 
programs: 



1 . American Public Transportation Association. 
(1999). Manual for the development of rail transit 

system safety program plans. 1 0. 

2. AREMA. Signal manual Part 17. 

3. EN 50126 / IEC 62278: Railway applications— The 
specification and demonstration of reliability, avail- 
ability, maintainability and safety (RAMS). (Sep- 1 1 . 
tember 1999), CENELEC, Central Secretariat: rue 

de Stassart 35, B — 1050 Brussels. 

4. EN 50128 / IEC 62279: Railway applica- 
tions — Communications, signaling and processing 1 2. 
systems— Software for railway control and protec- 
tion systems. (March 2001). CENELEC, Central 
Secretariat: rue de Stassart 35, B — 1050 Brussels. 

5. EN 50129: Railway applications — Communications, 13. 
signaling and processing systems — Safety related 
electronic systems for signaling. (February 2003). 
CENELEC, Central Secretariat: rue de Stassart 35, 

B— 1050 Brussels. 14. 

6. U.S. Nuclear Regulatory Commission. (Janu- 
ary 1981). Fault tree handbook. Report Number 
NUREG-0492. 

7. Handbook for transit safety and security certi- 15. 
fication, DOT-FTA-MA-90-5006-02-6l, DOT- 
VNTSC-FTA-02-12. 16. 

8. IEC 61508-1 : 1998: Functional safety of electri- 
cal/elect ro/programmable electron ic safety -related 1 7 . 
systems. Part I : General requirements. 

9. IEC CDIS 61508-2, Edition 1. Functional safety 

of electrical/electro/prog rammable electronic 1 8 . 

safety -related systems. Part 2: Requirements for 



electrical/electro/programmable electronic 
safety- related systems. 
IEC 61508-3: 1998. Functional safety of 
e lectrical/ electro/prog ran unable electron ic 
safety-related systems. Part 3: Software 
requirements. 

IEC 61508-4:1998. Functional safety of 
electrkal/electm/programmahle electronic 
safety- related systems. Part 4: Definitions and 
abbreviations. 

IEC 61508-5:1998. Functional safety of electrical/ 
electro/programmable electronic safety-related sys- 
tems. Part 5: Examples of methods for the determina- 
tion of safety integrity levels. 
IEC 61508-6, Edition 1. Functional safety of 
electrical/electro/programmable electronic safety- 
related systems. Part 6: Guidelines on the applica- 
tion of parts 2 and 3. 

IEC 61508-7:1998. Functional safety of electri- 
cal/electro/prog rammable electronic safety- related 
systems. Part 7: Overview of techniques and 
measures. 

IEEE Std 1012-1986. IEEE standard for software 
verification and validation plans. 
IEEE Std 1059-1 993. IEEE guide for software 
verification and validation plans. 
IEEE Std 1483-2000. IEEE standard for verifica- 
tion of vital functions in processor-based systems 
used in rail transit control 
System safety analysis hand boot (1997). 2nd 
Edition, System Safety Society, Sterling, Va. 



25 



INDEX 



alarms, 15-16; acknowledge and process, manual 

control of, 15; facility fire and intrusion, 16; 

Priority I and Priority II malfunctions, 15-16 
ambient environmental conditions, 3-4 
American National Standards Institute (ANSI), 

reference standards, 1 
atmospheric pollution, existing, 4 
audio communications, 16-17; audio recording 

device, 17; ECDs, 16, 17; intelligibility rating, 

17; internal telephone/intercom system, 17; 

O&M radio system, 17; passenger-initiated, 

16-17; public address system, 16, 17; 

requirements, 16; two-way emergency/voice, 

16-17; wireless, 17 
audit program, 20 

automated people mover (APM), definition of, 2 
automatic control functions, 14 
automatic coupling, 10 
automatic train control (ATC), 10-16; definition of, 

2; system fail-safe design, 6-8 
automatic train operation (ATO): definition 

of, 2; functions, 13; head-on collisions, 

prevention, 10 
automatic train protection (ATP): definition of, 2; 

functions, 10-13 
automatic train supervision (ATS): constraints on, 

13-14; definition of, 2; functions, 13-16; 

performance control and override, 14-16; status 

and performance monitoring, 14 

Blue Light Stations, 16 

boarding zones, 13 

braking, emergency, 10, 1.1, 12; definition of, 2; 

irrevocable, 12 
braking, service, definition of, 2 
braking interlocks, 1 2 

cable-propelled systems, 10-11 
central control, definition of, 2 
Central Control console: alarms and malfunction 

displays, 15, 16; emergency controls, 14; 

manual control and override functions, 15 
Central Control operator: definition of, 2; 

monitoring and override capability of, 10 
checked-redundancy, 6 -7 
climatic values, for operating 

environment, 3 
closed-circuit television (CCTV), 17, 18 
Code of Federal Regulations (CFR), reference 

standards, 1-2 
command switches, manual control of, 15 
Commercial audio equipment, 1, 17 



command power off/on, manual control of, 15 
communication systems, 4; electromagnetic 

emissions, 4-5; licensing requirements, 4-5 
consist, definition of, 2 

Daily Operations Log, 16 

data: collection and processing, 20; recording 
and reporting, 16 

definitions, 2-3 

departure interlocks, 12 

design wind speed, 3 

direction reversal interlocks, 12 

diverse operations, 7 

door and dwell time control, 1 3 

door control: departure interlocks, 12; dwell time, 
13; local manual reset, after unscheduled 
opening, 11; malfunctions, 9; manual 
operation of, 13; protection interlocks, 12; 
unscheduled door opening protection, 11 

Downtime Intervals, 9-10 

dwell time: control, 13; definition of, 2 

dynamic sign, definition of, 2 

electromagnetic background, 4 

electromagnetic compatibility, 4 

electromagnetic emissions, 4 

electromagnetic radiation, 4-5 

Emergency Communication Device (ECD), 16, 17 

emergency shutdown, 14-15 

emissions, electromagnetic, 4 

environment, site, 4 

Environmental test methods and engineering 

guidelines, 2, 4 
existing applications, requirements for, 1 
exterior airborne noise, 4 

facility fire alarms, 16 

fail-safe: alternatives to intrinsic, 6; 
checked-redundancy, 6-7; definition 
of, 2; design principles, 6-8; diversity and self 
checking, 7; intrinsic, 6; numerical assurance, 
7-8; N- version programming, 7 

failure: definition of, 2; worst-case, 10 

flood plain elevation, 4 

flood zones, 4 

free field, definition of, 2 

Gale Research Publication, 2 

Grace Time, 9 

Guide to the evaluation of human exposure to 

vibrations in buildings, 1 , 4 
guideway switch interlocks, 10, 12-13 



27 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



hazard, definition of, 2 

hazard analysis, 5-6, 20; description, 22; purpose, 
22. See also Operating and Support Hazard 
Analysis (O&SITA); Preliminary Hazard 
Analysis (PHA); Subsystem Hazard Analysis 
(SSHA) 

hazard resolution process, 5-6; identifying, 
techniques of, 5; risk assessment, 5; 
strategies or countermeasures, 5; unacceptable/ 
undesirable hazards, eliminating, 6, 7 

head-on collisions, prevention, 1.0 

headway: definition of, 2; management, 14 

hold trains, manual control of, 15 

humidity, 3 

icing, 3 

incident reporting, 20 

induced environmental parameters, 4-5 

initiate failure mode operations, manual 

control of, 15 
initiation of service, manual control of, 15 
Installation requirements for lightning protection 

systems, 1 , 4 
Institute of Electrical and Electronic Engineers 

(IEEE), publications, 1 
Intelligibility rating, 17 
interlocks, 12-1.3; braking, 12: definition of, 2; 

departure, 12; direction reversal, 12; guide way 

switch, 12; propulsion, 12; protection, 12 
internal telephone/intercom system, 17 
intrusion alarms, 16 
irrevocable emergency braking, 1212 

jerk, definition of, 2 

lightning, 4 

Local climatologic data, annual summary with 

comparative data, 2, 3 
lost signal protection. 11 

malfunction, equipment, 9 

malfunction reporting: absence of physical 
operator, procedures, 13; alarms, 15; fire and 
intrusion alarms, 16; priority classifications of, 
15-16 manual operation, 15; limitations, 16; 
override functions, 15; wind speeds for, 3 

maximum allowable train speed, 11 

maximum wind speed, 3 

mean time between hazardous events (MTBHE), 
definition of, 2, 8 

mean time between system or system subset failure 
(MTBF), 9, 10 

mean time to restore service (MTTRs), 9, 10 

Military Standards (MIL-STD), publications, 2 



mode management, 14 

modes of operation, 12, 14 

modify train operations, manual control of, 15 

motion control, 13 

motion detection, unintentional, 1 1 

National fire alarm code, 1 

National Fire Protection Association (NFPA), 

reference standards, 1 
National Oceanic and Atmospheric Administration 

(NOAA), publications, 2 
new applications, requirements for, 1 
noise: exterior airborne, measurement of, 4; pure 

tones, 4; structure- borne/vibration, 4; 

threshold of perception, 4 
number of failures (NF), 9 
numerical assurance, 7-8 
N- version programming, 7 

100-year flood level, 4 

Operating and Support Hazard Analysis 

(O&SHA), 6, 22-23; description, 22-23; 

purpose, 22 
operating environment: ambient conditions, 

3-4; induced environmental parameters, 

4-5 
operating hours (OH), 9, 10 
operations and maintenance (O&M) personnel 

communications, 17 
override functions, 14-16 
overspeed: definition of, 2; protection, 11 
overtravel: definition of, 2; protection, 11 

parted consist protection, 11 

passenger comfort limits, acceptable, 13 

passenger compartment, definition of, 2-3 

passenger information devices, 1 8 

perception, threshold of, 4 

performance control, 14-16; monitoring, 14 

Period of Operating Hours, 9 

permissive decision, definition of, 3 

personnel communications, operations and 

maintenance (O&M), 17 
pollution, existing atmospheric, 4 
power distribution system, 14 
Power Schematic Display (PSD), 14; conditions 

displayed, minimum, 14 
precipitation, 3 
Preliminary Hazard Analysis (PHA), 5, 20-21; 

description, 21; purpose, 20 
presence detection, 10, 11; locking, 13 
priority I malfunctions, 16 
priority II malfunctions, 1 6 
Private land mobile radio services, 2, 4 



28 



ANSI/ASCE/T&DI21-05 



programmed station stop. 13 
propulsion interlocks, 12 
protected zone, 1 2 
protection interlocks, 12 
public address system, 16, 17 
pure tones, 4 

radiation, electromagnetic, 4-5 
Radio frequency devices, 2, 5 
rainfall, 3 

rear-end collisions, protection, 10 
reference standards, 1-2 
Requirements for the control of 

electromagnetic emissions and 

susceptibility, 2, 4 
rerouting, 9 
risk, definition of, 3 
risk assessment, 5, 8, 20, 21 
route locking, 12 

safe state, definition of, 3 

safety critical: checked-redundancy, 6; definition 

of, 3; diversity and self-checking, 7; N- version 

programming, 7; PHA identification of, 20; 

software commands and responses, 21; 

verification and validation, 8 
safety principles, 6, 8, 10 
safety requirements: fail-safe design principles, 

and safety critical elements of ATC system, 

6-8; known safe state, 6, 7; principles of. 6, 8, 

10; System Safety Program, 5-6, 20; 

verification and validation, 8 
self-checking routines, 77 
separation, definition of, 3 
separation assurance, 10-11 
service availability: calculating, 1.0; 

definition of, 10 
service interruptions, 9; Downtime Intervals, 9-10; 

exceptions to, 9; Grace Time, 9 
service maintainability, 9-10; computing, 9-10; 

definition of, 9 
service reliability, 9 

shall (denotes mandatory requirement), 3 
should (denotes recommendation), 3 
signal interruption, 11 
single-point failures, 6, 14, 21 
site environment, 4 
snowfall, 3 
solar heat load, 4 

Specification for sound level meters, 1, 4 
speed limits, 11 
Standa rdfor c ommun i cations -based tra in 

(CBTC) performance and functional 

requirements, 1, 10 



Standard for fixed guideway transit and passenger 

rail systems, 1 , 16 
stations, passenger: boarding zones, 13; 

cameras, 18: information devices, 18; 

passenger comfort limits, acceptable, 13; 

programmed stops, 13; public address 

system, 16, 17; warning signals for arrivals/ 

departures, 18 
stoppage, unscheduled, 9, 1 5 
stopping all trains, manual control of, 15 
stopping distance, calculating, 10 
structure-borne noise/ vibration, 4 
subsystem, definition of, 3 
Subsystem Hazard Analysis (SSHA), 5, 21-22; 

description, 21-22; purpose, 21 
successive trains, 10-1.1 
system, definition of, 3 
system dependability, 8-10; definition of, 3 
System Hazard Analysis (SHA), 5-6 
System Operations Display (SOD), 14; display 

design, 14 
system safety, definition of, 3 
system safety interfaces, 20 
System Safety Program Plan (SSPP), 5-6; audit 

program, 20: data collection and processing, 20; 

description, 1 9; hazard analysis, 20; hazard 

resolution process, 5-6; incident reporting, 20; 

interfaces, 20; milestones of, 19-20; organization, 

19; purpose, 19; safety requirements and criteria, 

20; scope and objectives, 19; training, 20; 

verification, safety-related, 20 
System Safety Program Requirements (SSPP), 

5Jx 19-23 
system status monitoring, 14 
system survival, definition of, 3 

Telecommunications Industry Association, 

reference standards, 1 
temperature, 3 

termination of service, manual control of, 15 
time locking, 13 
time to restore service (TTR), 9 
train, definition of, 3 
train dispatching, manual control of, 1 5 
training, 20 

train removal, manual control of, 15 
train routing, 14-15; manual control of, 15 
train separation assurance, 10 
train tracking, 14 

ultraviolet radiation, 4 

uncoupling, detachment and/or separation, 1 1 
Underwriters Laboratories, reference standards, 1 
unintentional motion detection, 11 



29 



AUTOMATED PEOPLE MOVER STANDARDS— PART 1 



unscheduled door opening protection, 1 1 
unscheduled stoppage, 9, .15 

vehicle, definition of, 3 

verification and validation, 8, 20 

vibrations, system-induced, 4 

video surveillance, 17-18; of attended station 
platforms, 17; cameras in passenger stations, .18; 
closed-circuit television monitors, 17, 18; central 
control equipment, 17—18; real-time display of system 
status, 13; recording of video transmissions, 18 



Weather of U.S. cities, 2, 3 

wind speed, 3 

Wireless communication systems— pe rformance 

in noise and interference — limited 

situations— recommended methods 

for technology — independent 

modeling, simulation and 

verification — addendum 1, 1, 17 
wireless voice communications, 17 

zero speed: definition of, 3; detection, 1 1. 